Industrial Symbiosis: Turning One Industry’s Waste into Another’s Raw Material

How industrial symbiosis works, what Denmark's Kalundborg network has saved over fifty years, why most eco-industrial parks fail, and how UAE law and Gulf industrial clusters support by-product exchange.

Knowledge Hub → Circular Economy → Industrial Symbiosis: Turning One Industry’s Waste into Another’s Raw Material

Industrial Symbiosis: Turning One Industry’s Waste into Another’s Raw Material


Industrial cluster at dusk where by-products can be exchanged between plants

In short

Industrial symbiosis is one company using another’s waste as raw material. Steam from a power station heats a refinery. Gypsum from flue gas scrubbing goes to a plasterboard plant. Sludge from a pharmaceutical works fertilises farmland. The Danish town of Kalundborg has run the world’s best-documented example since 1972, saving participants around EUR 24 million a year and avoiding 635,000 tonnes of CO₂. It was not planned centrally. It grew because each individual exchange made commercial sense on its own.


Key facts

  • Kalundborg saves participating companies approximately EUR 24 million a year, about 182 million Danish kroner [1][2]
  • It avoids 635,000 tonnes of CO₂, conserves 3.6 million m³ of water, and saves 100 GWh of energy and 87,000 tonnes of solid materials annually [1][3]
  • The first by-product exchange is usually dated to 1972, when the oil refinery began supplying surplus gas to a new plasterboard plant; some accounts date the first exchange to 1961, when water was piped from Lake Tissø to the refinery [4]
  • More than 20 different resources are now exchanged among the partners, with some sources citing over 25 streams [2][3]
  • Socio-economic savings beyond enterprise level are estimated at a further 106 million Danish kroner a year [2]
  • Kalundborg is self-organising, driven by firm-level cost savings rather than subsidy or central planning [2][4]
  • Unprofitable exchanges are discontinued, which is why the network has survived fifty years [3]

Plain English — the essentials, in everyday language

Plain English

The basic idea

One company’s waste is another company’s raw material. That is the whole concept.

A power station produces excess steam it would otherwise vent. A refinery next door needs process heat. Connect them with a pipe and both gain. One gets paid for a waste. The other buys heat below the cost of generating it.

Multiply that across a dozen companies. You get an industrial ecosystem, not a set of isolated plants.

Kalundborg: what actually happens there

Kalundborg in Denmark is the reference case. It has run since 1972, and it has been measured properly.

How it started. Not with a masterplan. In 1972 the oil refinery began supplying surplus gas to a newly built plasterboard plant [4]. Steam and heat exchanges from the Asnæs power station followed later, mainly in the late 1970s and early 1980s. Every later link was added because it paid.

Who is involved. Around 13 partners [2][3]. They include Novo Nordisk and Novonesis, the energy company Ørsted, the utility Kalundborg Forsyning, and an oil refinery.

What moves between them:

ResourceFromTo
Steam and heatPower stationRefinery, pharmaceutical plants, district heating
GypsumFlue gas desulphurisationPlasterboard manufacture
BiogasOrganic waste conversionRefinery
Treated waterMultiple sourcesShared reuse across partners
SludgePharmaceutical productionFarmland as fertiliser
Fly ashPower stationCement and construction materials

More than 20 different resources move around the network, with some sources citing over 25 [2][3].

What it saves

The numbers are unusually well documented. A full life cycle assessment was run against a baseline with no exchanges [1].

Annual savings:

  • EUR 24 million in direct bottom-line savings, about 182 million Danish kroner [1][2]
  • 635,000 tonnes of CO₂ avoided [1][3]
  • 3.6 million m³ of water conserved [1][3]
  • 100 GWh of energy [1]
  • 87,000 tonnes of solid materials [1]

There is also an estimated 106 million Danish kroner a year in wider socio-economic savings [2].

Why it worked

Four conditions, and all four had to be present.

Proximity. Steam cannot travel far before it condenses. Heat and water exchanges need neighbours, not partners in the next region.

Compatible industries. One firm’s output must match another’s input specification. A power station and a plasterboard maker fit. A power station and a software firm do not.

Commercial logic in each link. Every exchange had to save both parties money on its own terms. Unprofitable ones were discontinued [3].

Trust and time. These are contracts between firms that depend on each other for supply. That took decades to build.

Why most attempts fail

Because someone tries to design the ecosystem before finding the exchanges.

The common failure looks like this. An “eco-industrial park” is built as a property proposition and marketed on sustainability. Everyone hopes symbiosis emerges. It usually does not.

What goes wrong:

  • Tenants are recruited for occupancy, not compatibility. No matching inputs and outputs, so no exchanges.
  • The anchor is missing. Successful networks have one large heat or steam source. Everything else attaches to it.
  • Nobody owns the connection. Pipework between two companies needs someone to build, own and maintain it.
  • Contracts are too fragile. No firm redesigns a process around a stream that may vanish next year.
  • Coordination costs exceed the savings. In small or mismatched parks, arranging the exchange costs more than the material is worth.

In the UAE and the Gulf

The Gulf has unusually good conditions for industrial symbiosis. They are structural rather than policy-driven.

Industry is already clustered. Jebel Ali, KIZAD, Ruwais, Jubail and Yanbu concentrate heavy industry in defined zones with shared infrastructure. Proximity is the hardest condition to create. Here it already exists.

The industrial mix is compatible. Refining, petrochemicals, aluminium, steel, cement, fertiliser and desalination sit side by side. Those sectors have large, steady, tradeable by-product streams.

Waste heat is abundant and currently wasted. Every process plant in the region rejects heat to ambient. Cooling is the dominant energy load here. That is a large unexploited resource.

Water is the obvious first exchange. Treated effluent, cooling blowdown and condensate all have value here. The alternative is desalinated water. Abu Dhabi already routes recycled water to irrigation at scale [5].

The legal barrier is already removed. Article 10 of Federal Law No. 12 of 2018 says usable secondary raw materials are not waste [6]. That matters enormously. Without it, moving a by-product between companies would trigger waste permitting at every step.

Article 7 goes further. It lets the Ministry require reuse or recycling where that is less harmful than disposal [6]. In Dubai, Law No. 18 of 2024 lets the authority compel segregation and sorting, and require facilities to accept waste-derived feedstock [7].

How to start

  • Map what leaves your site: material, quantity, quality, timing and current disposal cost
  • Map what you buy: heat, water, feedstock, inert fill
  • Look at your immediate neighbours first, then the wider zone
  • Start with one exchange that pays for itself, not with a park-wide programme
  • Get the specification right before the contract, because quality variation kills exchanges
  • Agree what happens if supply stops, because that is the risk the receiving plant carries

Professional layer — engineering, operations & compliance detail (click to expand)

Professional

The three kinds of exchange

Industrial symbiosis exchanges fall into three categories with very different characteristics.

Utility sharing. Steam, heat, cooling, compressed air, treated water. High value, requires physical infrastructure, and creates the strongest interdependence. Kalundborg’s largest exchanges, steam and heat from the Asnæs power station, fall into this category, although they were added after the first by-product exchange in 1972 [4].

By-product exchange. Solid or liquid residues used as feedstock: gypsum to plasterboard, fly ash to cement, sludge to agriculture. Lower infrastructure cost, higher specification risk.

Shared services. Joint waste contracts, shared treatment plant, common laboratory or logistics. Easiest to arrange, lowest transformational value, and often the right entry point because it builds the working relationship.

Sequence them in that order of difficulty in reverse: services first, then by-products, then utilities.

Feasibility assessment

A structured assessment answers five questions before any capital is committed.

1. Is there a quantity match? The output must be large enough to matter to the receiver and small enough that the receiver can absorb it. A mismatch of an order of magnitude kills the exchange.

2. Is there a quality match? The critical parameter is usually a contaminant, not the bulk composition. Gypsum from flue gas desulphurisation works in plasterboard because its chloride and heavy metal content are within specification. Change the fuel and that may cease to be true.

3. Is there a temporal match? Continuous output into a batch process, or vice versa, requires buffer storage. Storage of a waste may itself require a permit.

4. Who builds the connection? Pipework, pumping, metering and treatment between two sites. Ownership determines who carries the capital cost and who controls the asset.

5. What happens on failure? The receiving plant needs a fallback. If the by-product is a critical input and the supplier shuts down for maintenance, production stops. This is the single most common reason a technically sound exchange is rejected.

Contract structure

By-product supply agreements differ from ordinary supply contracts in three ways, and each needs explicit drafting.

Specification and rejection. Define the acceptance parameters, the sampling method, the frequency, and what happens to an off-specification load. Without this, one bad batch ends the relationship.

Continuity and force majeure. The supplier’s primary business is not producing this by-product. Their plant maintenance schedule is set by their own process. Agree notice periods and shutdown coordination.

Change of process. If the supplier changes feedstock, catalyst or fuel, the by-product changes. Require notification before any change that affects specification.

Price mechanism. Price the by-product against the receiver’s avoided purchase cost and the supplier’s avoided disposal cost. Both parties must be better off, and the split should be formulaic rather than renegotiated annually.

Regulatory treatment of by-products

This is where most exchanges stall, and it is a legal question before it is a technical one.

If the material is legally waste, transferring it triggers permitting, transport controls, manifests and receiving-site authorisation. If it is legally a product or by-product, it does not.

The UAE resolves this in statute. Article 10 of Federal Law No. 12 of 2018 provides that secondary raw materials usable in the same or another industry are not waste [6]. Establish at the outset which side of that line your material falls.

Where material remains waste, the receiving facility needs a permit covering that specific waste code, and movements need documentation: Bolisaty in Abu Dhabi, Montaji in Dubai [7][8].

Anchor tenants and network topology

Successful networks are not evenly connected. They have a hub.

Kalundborg’s topology centres on the Asnæs power station as the energy anchor, with the refinery and pharmaceutical plants as major secondary nodes [2][4]. Most exchanges connect to one of those three.

Design implications for a new industrial zone:

  • Identify the anchor first. A large, continuous energy or water source.
  • Recruit around the anchor, matching new tenants to available streams rather than filling space.
  • Build shared infrastructure corridors early, because retrofitting pipe racks between operating plants is expensive and disruptive.
  • Do not require participation. Mandated exchanges without commercial logic are abandoned as soon as attention moves on.

Measurement and verification

Claims about symbiosis benefits are frequently unverified. Kalundborg’s credibility rests on a 2018 life cycle assessment carried out to ISO 14040 with material flow analysis, comparing actual operations against a modelled baseline with no exchanges [1].

That is the right method. Three cautions when reading published figures:

Baseline definition drives the result. The counterfactual must be what would otherwise happen, not the worst plausible alternative.

Direct and socio-economic benefits are different things. Kalundborg’s official partnership figure is the conservative 182 million kroner enterprise-level benchmark, while a 2015 consultancy estimate placed total annual savings at 500 to 600 million kroner [2]. Cite the enterprise figure for a business case.

Water savings figures move over time. Earlier evaluations around 2004 reported roughly 2.9 million m³, against 3.6 million m³ more recently, reflecting network growth rather than measurement error [2].

Practitioner notes

Start with the waste transfer notes. A year of disposal records for a cluster is the cheapest symbiosis screening tool available, and it identifies both the streams and their current cost.

The receiving plant’s process engineer is the decision-maker, not the sustainability team. An exchange proceeds when the process engineer is satisfied the input will not damage the plant.

In Gulf conditions, prioritise heat and water over solid by-products. The value of avoided desalination and avoided cooling load exceeds the value of most solid material exchanges, and the infrastructure distances within an industrial city are short enough to be viable.


Common questions

What is industrial symbiosis? An arrangement where one company’s waste, by-product or surplus resource becomes another company’s raw material or utility input.

What does Kalundborg save? Around EUR 24 million a year in direct savings, plus 635,000 tonnes of CO₂, 3.6 million m³ of water, 100 GWh of energy and 87,000 tonnes of solid materials [1][2][3].

Was Kalundborg planned? No. Its first by-product exchange, surplus refinery gas supplied to a plasterboard plant, is usually dated to 1972, and it grew as each new exchange proved commercially worthwhile [4]. It is self-organising rather than centrally planned [2].

Why do eco-industrial parks fail? Usually because tenants are recruited for occupancy rather than compatibility, there is no anchor energy source, nobody owns the connecting infrastructure, or coordination costs exceed the savings.

Is by-product transfer legally waste? It depends on the jurisdiction. In the UAE, Article 10 of Federal Law No. 12 of 2018 provides that usable secondary raw materials are not waste [6].

Where should a Gulf industrial site start? With heat and water. The avoided cost of desalinated water and cooling energy is higher than the value of most solid by-product exchanges, and industrial cities already provide the proximity.


References

Show all 8 sources
  1. ENGIE Impact (2024) Eco-industrial park case study: Kalundborg. Annual savings of EUR 24 million, 635,000 tonnes of CO₂, 3.6 million m³ of water, 100 GWh of energy and 87,000 tonnes of solid materials; 2018 life cycle assessment to ISO 14040 with material flow analysis against a no-exchange baseline. Available at: https://www.engieimpact.com/insights/eco-industrial-park-case-study-kalundborg (Accessed: 25 August 2026).
  2. Grokipedia (2026) Kalundborg Eco-industrial Park. Participants including Novo Nordisk, Novonesis, Ørsted and Kalundborg Forsyning; self-organising system driven by economic incentives rather than central planning; direct savings of 182 million Danish kroner and socio-economic benefits of 106 million kroner annually; more than 20 resources exchanged; 2015 consultancy estimate of 500 to 600 million kroner total; earlier 2004 water saving estimate of 2.9 million m³ against 3.6 million m³ more recently. Available at: https://grokipedia.com/page/Kalundborg_Eco-industrial_Park (Accessed: 25 August 2026). Note: this is a secondary, AI-generated source; these figures should be verified against Kalundborg Symbiosis publications and the underlying studies before reliance.
  3. Council Fire (2025) Case study: Kalundborg industrial symbiosis. Approximately 13 participating entities exchanging over 25 resource streams; steam, water, biogas and gypsum exchanges; discontinuation of unprofitable exchanges; real-time monitoring of resource flows. Available at: https://www.councilfire.org/guides/case-study-kalundborg-industrial-symbiosis/ (Accessed: 25 August 2026).
  4. Kalundborg Symbiosis (n.d.) Official website, history section. 1961 water supply from Lake Tissø to the refinery; 1972 surplus refinery gas supplied to the Gyproc plasterboard plant; steam and heat exchanges from the Asnæs power station added mainly in the late 1970s and early 1980s; network built from commercially driven exchanges between neighbouring companies. Available at: https://www.symbiosis.dk/en/ (verify details against the current website before reliance).
  5. Arab Water Council, National Center for Water Resources (2024) Al Wathbah-2 wastewater treatment plant and Abu Dhabi irrigation scheme. Recycled water supplied for landscape and agricultural irrigation, replacing brackish groundwater abstraction. Available at: https://ncwr.arabwatercouncil.org/ (Accessed: 25 August 2026).
  6. United Arab Emirates (2018) Federal Law No. 12 of 2018 on Integrated Waste Management, Arts. 3, 7 and 10 (application in free zones; power to require reuse or recycling; secondary raw materials usable in the same or another industry are not waste). UAE Legislation Portal. Available at: https://uaelegislation.gov.ae/en (Accessed: 25 August 2026). The Arabic text is the legal instrument.
  7. Government of Dubai (2024) Law No. (18) of 2024 Regulating Waste Management in the Emirate of Dubai, Arts. 10 and 16, and Administrative Resolution No. (34) of 2026. Power to compel segregation and sorting and to require facilities to accept waste-derived feedstock; Waste Transfer Notes via Montaji. Dubai Legislation Portal. Available at: https://dlp.dubai.gov.ae/en (Accessed: 25 August 2026). The Arabic text is the legal instrument.
  8. Environment Agency – Abu Dhabi (2024) Waste licensing, permitting and inspection services; Bolisaty electronic manifest system. Available at: https://www.ead.gov.ae/ (Accessed: 25 August 2026).

Start here – Principles of the Circular Economy

Related – Linear vs Circular Models – Circular Economy Case Studies – Circular Economy in the Gulf – Commercial & Industrial Waste (C&I)

Go deeper – Oil & Gas Industry Waste – Circular Economy Policy Frameworks – The Waste Hierarchy – Waste Management in the Gulf Context


About this article

Charmaine Frost is a landfill gas and waste-management specialist and a founding director of Qualifrost FZC LLC. Her experience was gained with major UK waste-management companies, covering landfill gas generation and collection systems, environmental monitoring and the practical risks of landfill operations. She holds the NEBOSH International General Certificate and has submitted her final NEBOSH Diploma assessment, with results expected in March–April 2027.

Reviewed by Adrian Frost, Director. Every article is checked against primary sources before publication: legal claims are verified against the instrument itself, and figures against the original dataset.

Published 25 August 2026 · Last reviewed 25 August 2026 · Next review August 2027, or sooner if the law changes.