How to Commission a Waste Feasibility Study: A Client’s Guide

Learn what a waste feasibility study for a GCC project should contain, from waste characterisation to procurement options, and how to evaluate consultant proposals, including realistic fee ranges.

Knowledge Hub → Industry Directory → How to Commission a Waste Feasibility Study: A Client’s Guide

How to Commission a Waste Feasibility Study: A Client’s Guide

Engineers reviewing a landfill design drawing

In short: A waste management feasibility study is the foundational piece of technical and commercial analysis that underpins investment decisions, planning applications, regulatory approvals, and procurement processes for waste infrastructure. Commissioning a high-quality feasibility study requires understanding what such a study should contain, what data it requires, and what outputs it needs to deliver.

This guide, written for clients commissioning feasibility studies rather than practitioners preparing them, explains how to get maximum value from a feasibility study engagement. What Should a Waste Feasibility Study Contain? A comprehensive waste management feasibility study for a GCC project typically addresses:

  • Waste characterisation: Current waste generation rates by type and composition in the catchment area, based on primary survey data or reliable secondary sources. Growth projections to the facility’s design life horizon (typically 20–30 years).

This section directly determines facility capacity.

  • Technology assessment: Evaluation of technically appropriate treatment options for the specific waste stream — considering input composition, required output quality, technology maturity, Gulf climate performance, available equipment suppliers, and capital and operating cost benchmarks. Not a one-technology-fits-all exercise.
  • Site assessment: Evaluation of potential sites against siting criteria (proximity to waste sources, transport access, environmental sensitivity, utility availability, land cost, regulatory constraints). Multi-criteria scoring of shortlisted sites.
  • Technical specification: Preliminary design of the preferred facility — process flow, mass balance, key equipment specification, utility requirements, site layout.
  • Financial model: Capital cost estimate (Concept level — ±30%), operating cost estimate, revenue projections (gate fees, material sales, energy sales), financial returns analysis (NPV, IRR), sensitivity analysis.
  • Regulatory and permitting pathway: Identification of required permits and approvals, timeline, key risks and mitigation measures.
  • Procurement options: Assessment of delivery models — public sector build, PPP/DBFOT, O&M concession — and recommendation of the optimal procurement route for the specific project context. How to Evaluate Feasibility Study Proposals When evaluating proposals from feasibility study consultants, key questions to ask: Does the proposing team have direct, recent experience with similar projects in the GCC?

Are the key technical staff who will actually do the work named in the proposal (not only senior directors used to win the work)? Does the proposed methodology reflect the specific context of your project (not a generic template)? Is the proposed fee commensurate with the scope — a credible feasibility study for a major waste facility cannot be done thoroughly for less than USD 150,000–400,000? Qualifrost welcomes competitive evaluation of our proposals against any comparable advisory firm.

Feasibility study stages
  1. 1ObjectivesDefine the problem, scope and decision needed
  2. 2DataWaste quantities, composition and growth
  3. 3Technology optionsShortlist proven, suitable technologies
  4. 4SitesScreen and compare candidate sites
  5. 5Financial modelCapital, operating costs, gate fees and revenues
  6. 6RecommendationPreferred option and implementation roadmap

References

Show all 1 source
  1. Kaza, S., Yao, L., Bhada-Tata, P. and Van Woerden, F. (2018). What a Waste 2.0: A Global Snapshot of Solid Waste Management to 2050. Urban Development Series. Washington DC: World Bank.