Category Facility Design & Planning

EIA Screening & Scoping Checklist for Waste Infrastructure Projects in the UAE and GCC

Excavator working on a site investigation with a site operative

Before constructing a Material Recovery Facility (MRF), transfer station, composting/AD plant, Waste-to-Energy facility, or engineered landfill in the UAE or GCC, the developer must secure an Environmental Approval based on an Environmental Impact Assessment (EIA) prepared by an authority-registered environmental consultancy (e.g., EAD Class A consultant in Abu Dhabi or DM-accredited consultant in Dubai). Scoping must address hydrogeology, air dispersion (AERMOD), odour (H₂S/OU_E), noise, traffic, and cumulative impacts.