A cement kiln is the only industrial process that destroys waste, recovers its energy and absorbs its ash into the product simultaneously. This guide covers AFR, the thermal substitution rates actually achievable, the chemistry limits that stop plants going further, and the UAE cement context.
By Charmaine Frost, Director and Landfill Gas Specialist

In short
Alternative Fuels and Raw Materials, or AFR, refers to energy-rich waste materials used in place of coal or natural gas in cement kilns [1]. Thermal substitution rate measures the proportion of kiln thermal energy supplied by alternative fuel. Achievable rates differ sharply by injection point: 80 to 100 per cent in the calciner against 50 to 60 per cent in the kiln burner [2]. Many plants plateau at 20 to 30 per cent because of legitimate concern over chlorine bypass overload, preheater volatile buildup and clinker quality excursions [3]. MENA region kilns in early or intermediate co-processing typically operate at 10 to 25 per cent [4].
Key facts
- Maximum thermal substitution rate through RDF is 80 to 100 per cent in the cement calciner but 50 to 60 per cent in the kiln burner [2].
- Many plants plateau between 20 and 30 per cent substitution because of risk of chlorine bypass overload, volatile buildup in the preheater and clinker quality excursions [3].
- MENA and African region kilns in initial or intermediate co-processing stages typically operate at 10 to 25 per cent thermal substitution [4].
- UAE cement plants including those operated by Arkan, UCC and Fujairah Cement are among the largest in the GCC, with kilns processing 7,000 to 10,000 tonnes per day [1].
- Industry leaders operate at around 32 per cent globally while some plants exceed 80 per cent [5].
- Plants operating above 50 per cent substitution face tighter control requirements for flame stability, nitrogen oxide emissions and clinker free lime [6].
- RDF co-processing at 20 per cent substitution delivered environmental benefits of approximately 33 kg CO2 per tonne of cement [4].
- AI-assisted fuel management is reported to deliver up to 18 percentage points of TSR gain and fuel cost savings above USD 400,000 per kiln per year [5].
Plain English — the essentials, in everyday language
Plain English
What AFR means
AFR stands for Alternative Fuels and Raw Materials. It covers energy-rich waste used instead of coal or natural gas in a cement kiln [1].
The fuels side includes RDF and SRF, tyre-derived fuel, waste oils, solvents and biomass.
The raw materials side is different. Some wastes substitute for the limestone, clay, sand and iron that make up the raw meal. Fly ash, slag and foundry sand are examples.
Why cement kilns are ideal
Three reasons, and they compound in a way no other process matches.
Temperature. The burning zone exceeds 1,400 degrees Celsius with long residence time. Organic compounds fed to the burning zone are effectively destroyed. Dioxins can re-form as the gas cools, so this is prevented by cooling the gas quickly through the 200 to 450 degrees Celsius range.
Chemistry. The raw meal is highly alkaline, so acid gases like hydrogen chloride are largely neutralised in place and dedicated scrubbing is often unnecessary, although some kilns with high-sulphide raw materials still need sulphur dioxide controls.
No bottom ash. This is the big one. Ash and non-volatile metals are absorbed into the clinker mineral structure, so there is no bottom ash stream to dispose of, unlike an incinerator. Kiln dust or bypass dust may still need managing, and volatile metals such as mercury need separate control.
Thermal substitution rate
TSR is the metric everyone uses. It measures what proportion of the kiln’s thermal energy comes from alternative fuel rather than fossil fuel [5].
A plant at 30 per cent TSR gets nearly a third of its heat from waste.
The two injection points
This is the single most important technical fact, and it explains most of the variation between plants.
The calciner sits before the kiln and its job is to drive carbon dioxide off limestone. It runs cooler and is tolerant of variable fuel. Substitution reaches 80 to 100 per cent [2].
The main kiln burner produces the clinker. It needs a stable, hot, well-defined flame. Substitution is limited to 50 to 60 per cent [2].
So a plant’s overall TSR is a weighted average, and a high number is usually being achieved in the calciner.
Why plants get stuck at 20 to 30 per cent
Producers across Europe have pushed past 60 per cent, yet many plants remain between 20 and 30 per cent [3].
The reason is a legitimate operational fear, not conservatism for its own sake. Alternative fuels are chemically inconsistent, and feeding too much too fast risks three specific failures [3]:
Chlorine bypass overload. Volatile buildup in the preheater. Clinker quality excursions that are expensive to correct.
Without real-time visibility into fuel quality, operators default to conservative feed rates [3].
The chlorine problem again
Chlorine is the recurring constraint in every thermal route, and here it has a specific mechanism.
Chlorine volatilises in the kiln, travels with the gas, then condenses in the cooler preheater. It builds up in a cycle, sticking material to cyclone walls until the tower blocks.
A blocked preheater means an unplanned kiln stop, which in cement is very expensive.
Some kilns fit a chlorine bypass, extracting a slipstream of kiln gas to break the cycle. That allows more chlorine input but costs capital and produces a bypass dust needing disposal.
What the numbers look like in practice
Industry leaders run around 32 per cent globally, and some plants exceed 80 per cent [5].
In the MENA region, kilns in early or intermediate co-processing typically run 10 to 25 per cent [4].
A study modelling 20 per cent RDF substitution found environmental benefits of about 33 kg CO2 per tonne of cement [4].
The UAE picture
UAE cement plants, including those operated by Arkan, UCC and Fujairah Cement, are among the largest in the GCC, with kilns processing 7,000 to 10,000 tonnes per day [1].
That scale matters. A single large kiln can absorb a substantial share of a city’s high-calorific waste.
The market is described as competitive and over-capacitated, which sharpens the incentive to cut fuel cost [1].
Pre-processing is essential
You cannot tip mixed waste into a kiln. Fuel must be shredded, sorted and homogenised, with metals, glass and stones removed, to deliver a consistent kiln-ready fuel [1].
Consistency matters more than peak quality. A kiln can be tuned for a mediocre fuel. It cannot be tuned for a fuel that changes every delivery.
Professional layer — engineering, operations & compliance detail (click to expand)
Professional
AFR definition and scope
Alternative Fuels and Raw Materials refers to energy-rich waste materials used in place of conventional fossil fuels such as coal or natural gas in cement kilns, reducing cost and environmental impact as governments push decarbonisation in energy-intensive industries [1].
The distinction between the two components matters for accounting and permitting.
Alternative fuels substitute thermal energy: RDF and SRF, tyre-derived fuel, waste oils and solvents, impregnated sawdust, sewage sludge, agricultural residues and biomass. Performance is measured as thermal substitution rate.
Alternative raw materials substitute mineral input to the raw meal: fly ash, blast furnace slag, foundry sand, contaminated soils and certain filter cakes. These contribute silica, alumina, iron or calcium and are measured as a mass substitution rate, not a thermal one.
Some materials contribute both, and the accounting should separate the energy and mineral contributions.
Why the kiln process suits co-processing
Three characteristics distinguish a cement kiln from dedicated waste combustion.
Thermal conditions: burning zone gas temperatures above 1,800 degrees Celsius with material temperature above 1,400 degrees, and gas residence exceeding several seconds at high temperature, with material residence measured in tens of minutes. Destruction of organics fed to the burning zone is effectively complete, although organics in the raw meal can volatilise in the preheater before reaching it. De novo dioxin synthesis in the 200 to 450 degrees Celsius zone of the preheater exhaust and dust collector is avoided by rapid, controlled gas cooling.
Chemical conditions: the raw meal is strongly alkaline, so hydrogen chloride, hydrogen fluoride and sulphur dioxide are absorbed in situ by calcium compounds. Dedicated acid gas scrubbing is therefore often unnecessary. However, sulphur dioxide from sulphide (pyritic) sulphur in the raw meal is released in the upper preheater and not fully absorbed, so some kilns with high-sulphide raw materials still require SO2 abatement such as absorbent injection or scrubbers.
Residue management: ash and non-volatile metals are chemically incorporated into the clinker mineral phases. There is therefore no bottom ash stream, which avoids much of the residue disposal cost that burdens mass burn incineration. However, cement kiln dust and chlorine bypass dust may require management, and volatile metals such as mercury and thallium are not incorporated into clinker and need separate control.
The binding condition is that clinker quality and kiln stability govern acceptance absolutely. A cement operation will refuse any fuel that threatens either, irrespective of gate fee.
Thermal substitution rate by injection point
TSR measures the percentage of a kiln’s thermal energy supplied by alternative fuels rather than fossil fuels [5].
Achievable rates diverge sharply between the two firing positions. Maximum thermal substitution through RDF is 80 to 100 per cent in the calciner but limited to 50 to 60 per cent in the kiln burner [2].
The explanation is functional. The calciner performs limestone decarbonation at approximately 850 to 900 degrees Celsius with extended residence time, and is tolerant of coarser particle size, higher moisture and variable calorific value.
The main burner must sustain a stable, high-intensity flame producing the temperature profile that forms alite and the other clinker phases. Flame momentum, burnout rate and ash chemistry directly affect clinker mineralogy, which constrains particle size, moisture and ash content of the fuel.
Plant-level TSR is therefore a weighted average of the two positions, and high headline figures are generally achieved through calciner substitution with the main burner remaining predominantly fossil-fired.
Realistic performance bands
Reported performance spans a wide range, and the appropriate benchmark depends on maturity and region.
Industry leaders operate at around 32 per cent globally, while some plants exceed 80 per cent [5].
European producers, and increasingly those in North America and Asia, have pushed thermal substitution well past 60 per cent using refuse-derived fuel and biomass, yet many plants remain stuck between 20 and 30 per cent [3].
MENA and African region kilns in initial or intermediate co-processing stages typically operate at 10 to 25 per cent, consistent with GIZ guidelines, and plants commonly adopt 10 to 30 per cent during early co-firing programmes before increasing once fuel preparation and process control are optimised [4].
A modelled 20 per cent RDF thermal substitution scenario, aligned with regional benchmarks including Egypt’s 15 per cent alternative fuel policy, delivered environmental benefits of approximately 33 kg CO2 per tonne of cement, representing a mid-range abatement cost reflecting modest emission reduction alongside additional material-handling costs [4].
The plateau and its causes
The gap between demonstrated maximum and typical achieved substitution has a specific technical explanation rather than reflecting institutional caution.
Alternative fuels are chemically inconsistent, and feeding too much too fast risks chlorine bypass overload, volatile buildup in the preheater, and clinker quality excursions that are expensive to correct [3]. Without real-time visibility into fuel quality, operators default to conservative feed rates that leave substitution potential unused [3].
Three chemistry constraints dominate.
Chlorine drives the volatile cycle. Chlorides volatilise in the burning zone, travel with kiln gas, condense in the preheater and return with the raw meal, accumulating until buildup blocks cyclones and forces an unplanned stop. A chlorine bypass extracting a kiln gas slipstream breaks the cycle at the cost of capital, thermal efficiency and a bypass dust requiring disposal.
Sulphur and alkali circulation behaves comparably, forming rings and coating in the kiln inlet.
Free lime in clinker is the quality indicator most directly affected. Incomplete combustion or flame instability from inconsistent fuel raises free lime, degrading cement strength and soundness.
Plants operating above 50 per cent substitution face tighter control requirements for flame stability, nitrogen oxide emissions and clinker free lime, which makes informal supply specifications unworkable [6].
Fuel consistency and supply specification
Fuel consistency becomes more important as plants raise substitution rates, because changes in composition affect combustion behaviour from one delivery to the next [6].
Feedstock heterogeneity limits the ability to increase co-processing rates without additional investment in preparation, storage and process control. RDF moisture shifts between seasons and biomass calorific value changes with source, weather and storage conditions [6].
The commercial consequence is that fuel supply must be contracted against a specification, typically an EN 15359 or ISO 21640 class covering net calorific value, chlorine and mercury, with defined sampling and testing protocols. Informal supply arrangements are workable at low substitution and become untenable above roughly 50 per cent [6].
Pre-processing requirements
AFR pre-processing converts heterogeneous waste into kiln-ready fuel and is a prerequisite for meaningful substitution.
The function is to shred, sort and homogenise diverse waste streams, remove contaminants including metals, glass and stones, and deliver consistent kiln-ready fuel supporting higher thermal substitution rates [1].
Metals removal protects burner and conveying equipment and prevents localised melting. Inert removal reduces ash input and preserves calorific value. Size reduction to a specification determined by injection point governs burnout: calciner injection tolerates coarser material than main burner injection.
Homogenisation is the step most often underspecified. Blending across deliveries reduces batch-to-batch variation, which is precisely the variable that forces conservative feed rates.
Storage and feeding systems require design attention for fire risk, odour, dust and reliable metering of a low-density, irregular material.
Process control and instrumentation
Raising substitution safely depends on knowing what is entering the kiln in real time.
AI-driven AFR analytics platforms track fuel quality in real time and adjust feed rates dynamically, letting plants push substitution higher while protecting clinker quality and kiln stability [3]. Systems continuously estimate incoming fuel calorific value and contaminant load from near-infrared or feed-rate correlation sensors, then recommend a feed profile maximising substitution within the chemistry limits the kiln can absorb, converting AFR feeding from a static conservative ratio into a dynamic process [3].
Reported outcomes include up to 18 percentage points of TSR gain, up to 62 per cent global warming potential reduction, fuel cost savings above USD 400,000 per kiln per year, fewer unplanned stoppages and up to 25 per cent nitrogen oxide reduction [5]. A typical maturity trajectory runs from approximately 25 per cent manual baseline through 35 per cent at three months and 48 per cent at nine months toward a mature programme above 60 per cent [3].
These are vendor-reported figures and should be tested against the specific kiln configuration, but the underlying mechanism, that measurement enables higher safe feed rates, is sound.
Carbon accounting and verification
Co-processing performance is increasingly a reporting obligation rather than solely an efficiency measure.
As carbon border adjustment mechanisms and sustainability reporting frameworks mature, cement producers are asked to substantiate thermal substitution rate with auditable data rather than periodic estimates, and continuous timestamped records matter as much to compliance teams as to process engineers [3].
The biogenic fraction of alternative fuel is central to the carbon claim. Biomass-derived carbon is conventionally treated as biogenic while fossil-derived plastic carbon is not, so the biogenic content of RDF must be determined and documented rather than assumed. That determination requires a defined analytical method and periodic verification.
Application in the UAE and GCC
The regional position is favourable in scale and constrained in supply chain.
UAE cement plants, including those operated by Arkan, UCC and Fujairah Cement, are among the largest in the GCC, with kilns processing between 7,000 and 10,000 tonnes per day [1]. Those throughputs mean a single kiln can absorb a substantial fraction of an emirate’s high-calorific waste.
Commercial drivers are strong. Plants face rising CO2 regulation and energy price volatility, and using waste-derived fuels reduces emissions, aligns with national climate policy and improves sustainability credentials [1]. Fuel cost reduction is particularly significant in a competitive and over-capacitated UAE market [1].
Three regional considerations shape project design.
Waste composition raises chlorine risk. High plastic content improves calorific value but PVC content drives the chlorine constraint, making targeted PVC removal a higher priority in pre-processing here than in regions with lower plastic fractions.
Dedicated thermal capacity now competes for the same material. Dubai’s Warsan facility processes up to 6,000 tonnes per day and Abu Dhabi’s first waste-to-energy plant will process 900,000 tonnes annually from 2027, both accepting unprocessed waste without the preparation cost a kiln fuel requires. Cement co-processing therefore competes most effectively for commercial and industrial high-calorific streams rather than municipal residual waste.
Regional substitution rates start low. With MENA kilns typically at 10 to 25 per cent in early stages [4], the realistic near-term target is incremental improvement supported by pre-processing and instrumentation rather than immediate European-level substitution.
Under UAE Federal Law No. 12 of 2018, Article 10 provides that usable secondary raw materials are not waste where usable in the same or another industry, which supports treating specified AFR as a fuel product [7], and Article 7 permits the Ministry to compel reuse or recycling where less harmful than disposal [7]. Tadweer’s 80 per cent landfill diversion target for Abu Dhabi by 2031 [8] gives a policy driver for co-processing capacity alongside dedicated thermal treatment.
Frequently asked questions
What does AFR stand for? Alternative Fuels and Raw Materials: energy-rich waste used instead of coal or gas, plus wastes substituting for mineral raw meal components [1].
How much fossil fuel can be replaced? Between 80 and 100 per cent in the calciner but only 50 to 60 per cent in the main kiln burner [2].
Why do many plants stop at 20 to 30 per cent? Risk of chlorine bypass overload, preheater volatile buildup and clinker quality excursions when feeding inconsistent fuel without real-time quality data [3].
Why is there no bottom ash to dispose of? Ash and non-volatile metals are chemically incorporated into the clinker mineral phases, so there is no bottom ash stream as there is in incineration. Kiln dust or chlorine bypass dust may still require management, and volatile metals such as mercury need separate control.
What substitution rates are typical in this region? MENA and African kilns in early or intermediate co-processing typically run 10 to 25 per cent [4].
References
Show all 8 sources
- Arcler Projects. Transforming Waste to Fuel: AFR pre-processing for the UAE cement industry. August 2025. Accessed: 7 September 2026.
- ResearchGate. RDF combustion versus gasification integration in the cement industry: thermal substitution rates. Accessed: 7 September 2026.
- iFactory. Alternative Fuels in Cement: AFR and co-processing analytics. July 2026. Accessed: 7 September 2026.
- MDPI Sci. Fuel Substitution in Cement Production: A Comparative Life Cycle Assessment of Refuse-Derived Fuel and Coal. December 2025. Accessed: 7 September 2026.
- iFactory / JRS Innovation. AI-Powered Alternative Fuel Management in Cement Manufacturing 2026. March 2026. Accessed: 7 September 2026.
- Mordor Intelligence. Alternate Fuel and Raw Materials Market for the Cement Industry: growth trends and forecast 2026 to 2031. July 2026. Accessed: 7 September 2026.
- UAE Federal Law No. 12 of 2018 on Integrated Waste Management, Articles 7 and 10. Accessed: 7 September 2026.
- The National. Abu Dhabi to significantly cut landfill use in sweeping waste overhaul. 17 July 2026. Accessed: 7 September 2026.
Related articles
- Refuse-derived fuel and solid recovered fuel
- Mass burn incineration
- Emission control technologies
- Gasification
- Tyre waste
- Mechanical biological treatment
- Industrial symbiosis
- The waste hierarchy
- Waste management in the Gulf context
About this article
Charmaine Frost is a landfill gas and waste-management specialist and a founding director of Qualifrost FZC LLC. Her experience was gained with major UK waste-management companies, covering landfill gas generation and collection systems, environmental monitoring and the practical risks of landfill operations. She holds the NEBOSH International General Certificate and has submitted her final NEBOSH Diploma assessment, with results expected in March–April 2027.
Reviewed by Adrian Frost, Director. Every article is checked against primary sources before publication: legal claims are verified against the instrument itself, and figures against the original dataset.
Published 25 August 2026 · Last reviewed 7 September 2026 · Next review August 2027, or sooner if the law changes.