The London Protocol: Dumping of Waste at Sea
The London Protocol reversed the logic of ocean dumping control: instead of listing what is prohibited, it prohibits everything except a short reverse list. This guide covers the Protocol’s structure, the permitted categories, the permitting and assessment framework, and how it differs from MARPOL.
By Charmaine Frost, Director and Landfill Gas Specialist

In short
The 1996 Protocol to the Convention on the Prevention of Marine Pollution by Dumping of Wastes and Other Matter, known as the London Protocol, prohibits dumping of all wastes at sea except those on a permitted reverse list, and prohibits incineration at sea outright. It applies the precautionary approach and the polluter pays principle. Permitted categories include dredged material, sewage sludge, fish waste, vessels and platforms, inert inorganic geological material, organic material of natural origin, and bulky items in specified circumstances. Dumping requires a permit issued after assessment under the Waste Assessment Framework.
Key facts
- The London Protocol was adopted in 1996 to modernise and eventually replace the 1972 London Convention, and entered into force in 2006 [7].
- The Protocol reverses the Convention’s approach: all dumping is prohibited except for wastes on the permitted reverse list in Annex 1 [7].
- Annex 1 permits consideration of dredged material, sewage sludge, fish waste from industrial processing, vessels and platforms, inert inorganic geological material, organic material of natural origin, and bulky items primarily of iron, steel and concrete in specified circumstances [7].
- Incineration of wastes at sea is prohibited under the Protocol [7].
- Export of wastes to other countries for dumping or incineration at sea is prohibited, except that a 2009 amendment, provisionally applied since 2019, permits export of CO2 streams for sub-seabed geological storage under agreements between the countries concerned [7].
- The precautionary approach and the polluter pays principle are expressly incorporated [7].
- Dumping of permitted wastes requires a permit issued following assessment under the Waste Assessment Framework in Annex 2 [8].
- The Protocol governs deliberate disposal of material loaded on shore, which distinguishes it from MARPOL, which governs operational discharge from ships [1].
Plain English — the essentials, in everyday language
Plain English
What the Protocol covers
Deliberate disposal of waste at sea. Loading waste onto a vessel, aircraft or platform, taking it out to sea, and dumping it.
It also covers deliberate disposal of the vessels and platforms themselves.
How it differs from MARPOL
This distinction is worth being clear about because the two are often confused.
MARPOL governs pollution arising from the normal operation of ships, meaning the waste a ship generates while operating [1].
The London Protocol governs deliberate dumping of material brought from shore for the purpose of disposal.
A ship discharging its own galley waste is a MARPOL matter. A barge carrying dredged sediment out to a designated disposal site is a London Protocol matter.
The reverse list
The Protocol’s central innovation, and the reason it is stricter than what came before.
The 1972 London Convention listed what could not be dumped, so anything not listed was permissible.
The 1996 Protocol inverts that. All dumping is prohibited except wastes on a specified list.
Anything not on the list cannot be dumped, without needing to prove it is harmful.
What may be considered
Annex 1 sets out the categories that may be considered for dumping:
Dredged material.
Sewage sludge.
Fish waste, or material resulting from industrial fish processing operations.
Vessels and platforms or other man-made structures at sea.
Inert, inorganic geological material.
Organic material of natural origin.
Bulky items primarily comprising iron, steel, concrete and similarly harmless materials, in specified circumstances.
May be considered, not may be dumped
An important qualification. Being on the list does not authorise dumping.
It means the waste may be considered for a permit. A permit still has to be applied for and assessed.
Incineration at sea is banned
The Protocol prohibits incineration of wastes at sea outright.
That closes a route that was previously used for difficult wastes, particularly organochlorine material.
Export for dumping is banned
Parties may not export wastes to other countries for dumping or incineration at sea. The one exception, under a 2009 amendment applied provisionally since 2019, allows export of CO2 streams for storage beneath the seabed where the countries concerned have an agreement.
Without that provision, a Party could comply domestically while shipping the problem elsewhere.
The precautionary approach
The Protocol expressly incorporates the precautionary approach.
That means appropriate preventative measures should be taken where there is reason to believe wastes are likely to cause harm, even where there is no conclusive evidence of a causal relationship.
The burden runs toward caution rather than toward proof of harm.
Polluter pays
Also expressly incorporated. The polluter should, in principle, bear the cost of pollution.
Getting a permit
Dumping a listed waste requires a permit, and the permit follows an assessment.
The Waste Assessment Framework in Annex 2 sets out what must be assessed: waste characterisation, whether prevention is possible, whether alternatives exist, the disposal site, potential effects, and monitoring requirements.
The alternatives test
The most consequential element in practice.
Before a permit can be issued, the applicant must show that opportunities to reduce or prevent the waste have been considered, and that land-based alternatives have been evaluated.
Dumping is a last resort rather than a default option for cheap disposal.
Dredged material dominates
By volume, dredged material is the overwhelming majority of what is lawfully dumped at sea worldwide.
Ports, harbours and navigation channels require periodic dredging, and the volumes are large.
Whether the material may be dumped depends on its contamination, which is why sediment characterisation is central to dredging projects.
Why this matters regionally
Gulf ports and coastal development involve substantial dredging.
The Gulf’s shallow, semi-enclosed character, already recognised through MARPOL Special Area designation [2], means disposal site selection and sediment quality assessment carry more weight than in open-ocean settings.
Professional layer — engineering, operations & compliance detail (click to expand)
Professional
Instrument and relationship to the 1972 Convention
The Convention on the Prevention of Marine Pollution by Dumping of Wastes and Other Matter, 1972, known as the London Convention, was among the first global instruments to protect the marine environment from human activities.
The 1996 Protocol to that Convention, the London Protocol, was adopted to modernise and eventually replace it, and entered into force in 2006.
Both instruments remain in force, with Parties to the Protocol that are also Parties to the Convention having the Protocol supersede the Convention as between them.
Administration is through the International Maritime Organization.
Scope and definitions
The Protocol addresses dumping, defined as any deliberate disposal into the sea of wastes or other matter from vessels, aircraft, platforms or other man-made structures at sea, and any deliberate disposal of those vessels, aircraft, platforms or structures themselves.
Critically, dumping does not include disposal of wastes incidental to, or derived from, the normal operations of vessels, aircraft, platforms or other man-made structures. That exclusion is the boundary with MARPOL, which governs operational discharge [1].
Nor does it include placement of matter for a purpose other than mere disposal, provided the placement is not contrary to the aims of the Protocol. That provision accommodates activities such as artificial reef construction and coastal engineering, while preventing the exception being used to disguise disposal.
The Protocol also covers storage of wastes in the seabed and subsoil, and abandonment or toppling at site of platforms for the sole purpose of deliberate disposal.
The reverse list approach
The Protocol’s defining structural feature is the reversal of the permissive presumption.
Under the 1972 Convention, dumping was permitted unless the material was listed as prohibited, placing the burden on regulators to identify and list harmful substances.
Under the 1996 Protocol, dumping of all wastes and other matter is prohibited except for those listed in Annex 1, which may be considered for dumping. The burden shifts to the applicant, and material not on the list cannot be dumped irrespective of whether harm can be demonstrated.
Annex 1 comprises [7]:
Dredged material.
Sewage sludge.
Fish waste, or material resulting from industrial fish processing operations.
Vessels and platforms or other man-made structures at sea.
Inert, inorganic geological material.
Organic material of natural origin.
Bulky items primarily comprising iron, steel, concrete and similarly unharmful materials, for which the concern is physical impact, and limited to circumstances where such wastes are generated at locations with no practicable access to disposal options other than dumping, principally small islands with isolated communities.
Carbon dioxide streams from carbon dioxide capture processes for sequestration were added by amendment, subject to specified conditions.
The listing operates as a gateway to consideration rather than as an authorisation. Wastes on Annex 1 may be considered for dumping, and each proposal remains subject to permit and assessment.
Prohibitions
Two prohibitions supplement the reverse list.
Incineration of wastes or other matter at sea is prohibited [7]. That closes a disposal route formerly used for difficult organic wastes, particularly organochlorine material, and it removes the option of thermal destruction outside national jurisdiction.
Export of wastes or other matter to other countries for dumping or incineration at sea is prohibited. Without that provision, a Party could satisfy its own obligations while transferring the activity to a jurisdiction with weaker controls, and the prohibition parallels the logic of the Basel Ban Amendment [3]. A 2009 amendment to Article 6, provisionally applied since 2019, permits export of CO2 streams for sub-seabed geological storage subject to agreements between the countries concerned.
Guiding principles
The Protocol expressly incorporates two principles that shape how its provisions are applied.
The precautionary approach requires that appropriate preventative measures are taken when there is reason to believe that wastes or other matter introduced into the marine environment are likely to cause harm, even when there is no conclusive evidence to prove a causal relation between inputs and their effects.
The polluter pays principle requires that the polluter should, in principle, bear the cost of pollution.
Contracting Parties are also to act so as not to transfer, directly or indirectly, damage or likelihood of damage from one part of the environment to another, or transform one type of pollution into another. That provision has direct relevance to waste management decisions generally, since it articulates the burden-shifting concern that underlies cross-media assessment.
Permitting and the Waste Assessment Framework
Dumping of Annex 1 wastes requires a permit issued by the national authority, and the permit decision follows the assessment required by Annex 2, the Waste Assessment Framework.
The Framework requires assessment across a defined sequence [8].
Waste characterisation, establishing physical, chemical and biological properties, including source, composition and contaminant concentrations, sufficient to determine potential effects.
Waste prevention audit, examining the sources of the waste and whether generation can be reduced or eliminated at source, including through process modification and cleaner production.
Consideration of waste management options, evaluating practical availability of alternatives including reuse, recycling, treatment and land-based disposal, with a comparative assessment of their environmental and human health risks against those of dumping.
Action list and chemical screening, establishing upper and lower thresholds against which the waste is assessed, with material above the upper level not eligible for dumping and material below the lower level presenting negligible concern.
Dump-site selection, assessing physical, chemical and biological characteristics of candidate sites, proximity to amenities and resources, and capacity.
Assessment of potential effects, producing an impact hypothesis identifying expected consequences and forming the basis of the monitoring programme.
Monitoring, designed to test the impact hypothesis and to confirm that permit conditions are met.
Permit and permit conditions, with the decision requiring that opportunities to prevent or reduce the waste have been considered and that alternatives have been evaluated.
The alternatives requirement is the operative constraint in most cases. A permit cannot properly be issued where a practicable land-based alternative exists, which positions sea disposal as a residual option rather than a cost-driven choice.
Dredged material in practice
Dredged material constitutes the overwhelming majority of material lawfully dumped at sea by volume worldwide, and it is the category most likely to concern port and coastal operators.
Dredging arises from initial capital works for new ports and channels, and from recurrent maintenance to sustain navigable depth against sedimentation.
Assessment centres on contamination. Sediment from industrial ports, historic anchorages and areas receiving urban drainage carries metals, hydrocarbons, tributyltin from historic antifouling practice, and organic contaminants.
The action list mechanism operates directly here. Sediment below the lower threshold is generally suitable for open-water disposal subject to physical considerations; sediment above the upper threshold is not eligible and requires land-based management; sediment between the thresholds requires case-by-case assessment and may require management options such as confined disposal, capping or treatment.
Physical effects require assessment independently of contamination, including smothering of benthic communities, turbidity during disposal, and alteration of seabed morphology and sediment transport.
Beneficial use should be evaluated before disposal, and options include beach nourishment, habitat creation, land reclamation fill and construction material, each of which removes the material from the disposal category entirely.
Vessels, platforms and structures
Disposal of vessels and platforms is permitted for consideration under Annex 1, subject to preparation requirements.
The material must be pre-treated to remove, to the maximum extent, material likely to create floating debris or contribute to pollution, including oils, fuels, cables and other hazardous material.
Platform decommissioning in particular engages both the Protocol and regional instruments, and disposal at sea is generally the exception rather than the norm, with removal to shore for dismantling and recycling the default expectation.
Abandonment or toppling at site for the sole purpose of deliberate disposal falls within the Protocol’s scope, which prevents decommissioning by neglect being treated as outside the regime.
Relationship with other instruments
Distinguishing the applicable instrument is a recurring practical question.
MARPOL governs discharge of waste generated by the normal operation of a ship, including garbage under Annex V and oily water under Annex I [1]. The London Protocol governs deliberate disposal at sea of material loaded for that purpose.
Basel governs transboundary movement of hazardous waste [3]. Material moved between States for sea disposal engages both the Basel movement controls and the Protocol’s prohibition on export for dumping.
National waste law governs the material while on land, including its classification and the permitting of any land-based alternative.
Regional seas conventions may impose additional requirements within their geographic scope.
Application in the UAE and GCC
Regional relevance arises principally through dredging associated with port development, coastal reclamation and navigation maintenance, and through offshore platform decommissioning.
Three factors distinguish the regional context.
The receiving environment is unusually sensitive. The Gulf is shallow, semi-enclosed and has restricted exchange through the Strait of Hormuz, characteristics recognised in its designation as a MARPOL Special Area under Annexes I and V [2]. Those same characteristics mean dumped material disperses poorly and effects accumulate, which raises the weight given to site selection and to the impact hypothesis under the Waste Assessment Framework.
Dredging volumes are substantial. Extensive port development, channel maintenance and coastal reclamation generate large quantities of dredged material, and the beneficial use route, particularly reclamation fill, is more readily available regionally than in many jurisdictions, which strengthens the alternatives assessment against disposal.
Offshore hydrocarbon infrastructure will generate decommissioning obligations, engaging the provisions on vessels, platforms and structures and the prohibition on abandonment for the sole purpose of disposal.
The land-based interface is governed by national law. Under UAE Federal Law No. 12 of 2018, Article 3 applies the law inside the State including free zones, Article 13 addresses hazardous waste and Article 10 provides that usable secondary raw materials are not waste where usable in the same or another industry [4], the last of which supports beneficial use classification for suitable dredged material. Hazardous waste in Dubai attracts a gate fee of AED 550 per tonne against AED 100 for general and organic waste and AED 2 for clean inert construction and demolition material [5], and the differential is directly relevant to the economics of land-based management of contaminated sediment.
Where dredged material is contaminated above thresholds, the treatment routes are those applicable to contaminated soil, including stabilisation and solidification, thermal desorption for hydrocarbon contamination and secure disposal [6].
Frequently asked questions
How does the London Protocol differ from MARPOL? MARPOL governs discharge of waste generated by a ship’s normal operation; the Protocol governs deliberate disposal at sea of material loaded for that purpose [1].
What is the reverse list? Under the Protocol all dumping is prohibited except for the categories listed in Annex 1, which may be considered for a permit. Material not listed cannot be dumped.
Is incineration at sea allowed? No. The Protocol prohibits incineration of wastes at sea outright, and also prohibits export of wastes to other countries for dumping or incineration at sea, except export of CO2 streams for sub-seabed geological storage, which a 2009 amendment, provisionally applied since 2019, permits under agreements between the countries concerned.
What must a permit application demonstrate? That waste prevention has been considered and that practicable alternatives, including land-based options, have been evaluated, alongside characterisation, site selection and impact assessment.
What is actually dumped at sea? Predominantly dredged material, which forms the overwhelming majority by volume, with eligibility determined by contamination against action list thresholds.
References
Show all 8 sources
- International Maritime Organization. MARPOL Annex V: operational discharge provisions and the boundary with deliberate dumping. Accessed: 7 September 2026.
- International Maritime Organization. MARPOL Special Areas: Gulf designation under Annexes I and V. Accessed: 7 September 2026.
- Basel Convention Secretariat. Prior Informed Consent procedure and Ban Amendment. Accessed: 7 September 2026.
- UAE Federal Law No. 12 of 2018 on Integrated Waste Management, Articles 3, 10 and 13. Accessed: 7 September 2026.
- Business Dubai. Waste Management and Recycling Business in Dubai: gate fee schedule. August 2026. Accessed: 7 September 2026.
- Journal of Ecological Engineering. Evaluation of the Solidification/Stabilization of Heavy Metals using Portland Cement. Accessed: 7 September 2026.
- International Maritime Organization. 1996 Protocol to the Convention on the Prevention of Marine Pollution by Dumping of Wastes and Other Matter: Annex 1 permitted categories and prohibitions. Accessed: 7 September 2026.
- International Maritime Organization. London Protocol Annex 2: Waste Assessment Framework and permit requirements. Accessed: 7 September 2026.
Related articles
- MARPOL Convention
- Marine and port waste
- Basel Convention
- Transboundary waste shipment
- Sludge management
- Soil remediation
- Oil and gas industry waste
- Sewage sludge and biosolids
- Waste management in the Gulf context
About this article
Charmaine Frost is a landfill gas and waste-management specialist and a founding director of Qualifrost FZC LLC. Her experience was gained with major UK waste-management companies, covering landfill gas generation and collection systems, environmental monitoring and the practical risks of landfill operations. She holds the NEBOSH International General Certificate and has submitted her final NEBOSH Diploma assessment, with results expected in March–April 2027.
Reviewed by Adrian Frost, Director. Every article is checked against primary sources before publication: legal claims are verified against the instrument itself, and figures against the original dataset.
Published 25 August 2026 · Last reviewed 25 August 2026 · Next review August 2027, or sooner if the law changes.