Oman: Waste Regulation, be’ah and the Environment Authority
Oman’s waste framework rests on Royal Decree 114/2001 for environmental protection and ministerial regulations for waste, notably Ministerial Decision 17/93 (solid non-hazardous waste) and Ministerial Decision 18/93 (hazardous waste), with be’ah as the national operator. This guide covers the permitting regime, the hazardous waste consignment note system, published disposal tariffs and the sanitary landfill design rules set out in regulation.
By Charmaine Frost, Director and Landfill Gas Specialist

In short
Oman regulates waste through Royal Decree 114/2001, the Law on Conservation of the Environment and Prevention of Pollution, supported by the Regulations for the Management of Solid Non-Hazardous Waste (Ministerial Decision 17/93) and the Regulations for the Management of Hazardous Waste (Ministerial Decision 18/93). No source or area of work may commence before obtaining an environmental permit confirming its environmental soundness [1]. Solid non-hazardous waste may only be disposed of in licensed sanitary landfills, and must never be mixed with hazardous waste at any stage [2]. Hazardous waste movement requires a Consignment Note for each category before it leaves the generator’s premises [3]. be’ah operates national treatment infrastructure with published tariffs [4].
Key facts
- Royal Decree 114/2001 requires an environmental permit before any source or area of work is established, issued by the Environment Authority (which took over the former Ministry’s permitting functions) on application by the owner [1].
- Solid non-hazardous waste may only be disposed of in sanitary landfills licensed by the Environment Authority, and must not be mixed with hazardous waste at any stage [2].
- Landfill design must follow the guidelines in appendix 4 to the Regulations, with an environmental impact assessment submitted to the Environment Authority [2].
- Landfill capacity planning assumes compacted waste occupies 1.2 m3 per tonne and uncompacted waste 2 m3 per tonne, with each stage designed for 3 to 4 years of waste [2].
- Compacted waste layers must be covered by suitable filling material 0.25 metres thick, and waste must not be left uncovered after work hours [2].
- Every hazardous waste generator must complete a Consignment Note for each category before the waste leaves their premises [3].
- be’ah published disposal tariffs are OMR 7 per tonne inert landfill, OMR 15 single lined, OMR 21 double lined, OMR 72 solidification, and OMR 92 to 3,000 for incineration and physico- chemical treatment [4].
- Radioactive waste is defined as waste with activity above 100 becquerels per gram [1].
Plain English — the essentials, in everyday language
Plain English
The legal foundation
One Royal Decree from 2001 and two sets of ministerial regulations from 1993 form the backbone.
Royal Decree 114/2001 is the Law on Conservation of the Environment and Prevention of Pollution. It is the general environmental statute [1].
The Regulations for the Management of Solid Non-Hazardous Waste (Ministerial Decision 17/93) deal with non-hazardous solid waste and sanitary landfill [2]. Royal Decree 115/2001 is sometimes cited as a waste law, but it concerns the protection of potable water sources from pollution.
The Regulations for the Management of Hazardous Waste (Ministerial Decision 18/93) govern hazardous waste [3].
The permit requirement
The central obligation is straightforward.
No source or area of work may be established before obtaining an environmental permit confirming its environmental soundness [1].
The law assigns the permit to the Ministry, on application by the owner [1]. That function is now exercised by the Environment Authority, established by Royal Decree 106/2020, so applications go to the Authority.
Environmental impact assessment
Where an activity may pose an avoidable or curable risk to the environment, the owner must submit a detailed environmental impact assessment before applying for the permit [1].
The assessment must confirm that the benefits of the activity surpass the potential damage [1].
Record keeping
Owners must keep records of quantities, types and methods of discharge, and the Environment Authority may examine those records at any time [1].
How waste is defined
Waste means the various types of refuse resulting from industrial, mining, agricultural, handicraft, domestic, hospital, public establishment or other operations, which are disposed, recycled or neutralised under the laws in force [1].
Hazardous waste is waste that retains its toxic, explosive or combusting properties [1].
Radioactive waste is defined numerically, as waste with radiation activity above 100 becquerels per gram [1].
Landfill rules are unusually specific
Oman’s solid waste Regulations set out sanitary landfill requirements in detail, which is useful because it removes ambiguity.
Solid non-hazardous waste may only be disposed of in sanitary landfills licensed by the Environment Authority, and must not be mixed with hazardous waste at any stage [2].
The operator must obtain a licence and design and operate the site according to appendix 4 of the Regulations, submitting an environmental impact assessment [2].
The design numbers
For capacity planning, the Regulations state assumptions directly [2]:
Compacted waste, after some stabilisation, occupies about 1.2 m3 per tonne.
Uncompacted waste occupies about 2 m3 per tonne.
Materials used for daily and final cover must be included in the capacity estimate.
Each disposal stage must be designed to hold 3 to 4 years of waste, with one stage operating at a time.
The operating rules
Also set out in the Regulations [2]:
No waste other than solid non-hazardous waste may be disposed of.
No liquid or hazardous waste, including hospital waste.
Sludge must be dried to at least 20 per cent dry solids, must not exceed 15 per cent of total deposited solids, and needs Environment Authority approval.
Carcasses and slaughterhouse waste need Environment Authority approval.
The site must be fenced, the entrance closed outside work hours and guarded during them.
All waste received must be monitored and recorded by type, quantity and source.
Compacted layers must be covered with 0.25 metres of suitable filling material.
Waste must not be left uncovered after work hours.
Scavenging is not allowed, and burning on site is prohibited.
Hazardous waste and the Consignment Note
The control mechanism for hazardous waste is documentary.
Every hazardous waste generator must complete a Consignment Note for each category of hazardous waste before it leaves their land or premises [3].
A Consignment Note lists the category and quantity of hazardous waste [3].
All hazardous waste must be labelled and packed according to Ministerial Decision [3].
Licensing across the chain
Every link needs its own licence [3].
Storage facility owners must be licensed, and may only release waste accompanied by a Consignment Note.
Pretreatment facility owners must be licensed before starting activities.
Hazardous waste landfill owners must be licensed, and may not receive waste without a Consignment Note.
Ministry of Health approval is required before a licence is issued for any project involving collection, transport, storage, pretreatment or disposal of hazardous waste [3].
Recycling at the point of generation
A practical exemption. Hazardous waste may be recycled at the point of generation or elsewhere within the Regulations, and where recycling is limited to the point of generation the generator is not required to complete a Consignment Note [3].
be’ah
be’ah is the national environmental services company, operating landfills, treatment facilities and collection.
It runs an online manifest system. Waste generators must create a manifest through it, giving generator details and waste information, to enable tracking and ensure safe handling [4].
The manifest number must be clearly visible on all packaging and containers [4].
What treatment costs
be’ah publishes its rates, which is unusual and useful for planning [4]:
Inert landfill: OMR 7 per tonne.
Single lined landfill: OMR 15 per tonne.
Double lined landfill: OMR 21 per tonne.
Solidification: OMR 72 per tonne.
Incineration, physico-chemical treatment and others: OMR 92 to 3,000 per tonne.
Minimum charge equals the disposal fee for one tonne. An admin charge of OMR 50 per transaction applies below one tonne for other treatment types. Rates exclude VAT [4].
Liability
Ownership and liability remain with the generator until the waste is received at the treatment facility and checked for conformance [4].
If waste is rejected for non-conformance, the generator is responsible for returning it [4].
That is a chain of custody rule with real commercial consequences.
Professional layer — engineering, operations & compliance detail (click to expand)
Professional
Legislative architecture
Oman’s waste and environmental framework rests on Royal Decree 114/2001, supplemented by ministerial regulations and by the operational role of the national environmental services company.
Royal Decree 114/2001 issues the Law on Conservation of the Environment and Prevention of Pollution, the general environmental statute establishing permitting, environmental impact assessment, discharge control and definitions [1].
The Regulations for the Management of Solid Non-Hazardous Waste (Ministerial Decision 17/93) address non-hazardous solid waste, including sanitary landfill requirements set out in appendices [2]. Royal Decree 115/2001 concerns the protection of potable water sources from pollution and is not a waste management law.
The Regulations for the Management of Hazardous Waste (Ministerial Decision 18/93) establish the consignment note system and licensing of hazardous waste facilities [3].
Institutional responsibility sits with the Environment Authority as regulator, established by Royal Decree 106/2020 to take over the functions formerly exercised by the Ministry of Environment and Climate Affairs (where the instruments refer to ‘the Ministry’, read this as the Environment Authority for current practice), with be’ah as the national operator delivering collection, treatment and disposal infrastructure.
Definitions
The statutory definitions determine scope and are stated with useful precision [1].
Waste means the various types of refuse resulting from industrial, mining, agricultural, handicraft, domestic, hospital, public establishment or other operations, which are disposed, recycled or neutralised in accordance with the laws in force in the Sultanate [1].
Treatment of wastes means any natural, physical, chemical or biological process applied to wastes to alter their properties in a way that prevents or reduces harmful effects, or renders them more suitable for reuse in part or whole [1].
Hazardous waste is waste retaining toxic, explosive and combusting properties [1].
Radioactive waste is defined by a numerical threshold, being waste with radiation activity above 100 becquerels per gram that poses risk to human life and health or the environment, whether by itself or through contact with other waste [1].
Sanitary landfill means any site licensed by the Ministry for disposal of non-hazardous waste [1].
Handling of hazardous substances and waste covers all operations of moving them for collection, transport, storage, treatment, reuse, disposal or re-export, including subsequent care of disposal or burial sites [1].
Permitting regime
The permitting requirement under Royal Decree 114/2001 is general and precedes establishment.
No establishment of any source or area of work may be started before obtaining an environmental permit confirming its environmental soundness, issued on application by the owner to the Ministry (now the Environment Authority) [1].
Environmental impact assessment applies where risk is identified. The owner of any source or area of work which, according to criteria specified by the Ministry, may constitute an avoidable or curable risk to the environment must submit a detailed environmental impact assessment study before applying for the permit, confirming that the benefits of the source or area of work surpass the potential damage [1].
Siting is controlled through buffer requirements. The site must have a reasonable safe area to ensure pollutants do not exceed allowed limits and that the rate of pollution from all sources in the area of work stays within permitted limits [1].
Record keeping is an ongoing permit obligation. Owners must keep records of quantities, types and methods of discharge, and the Ministry may examine those records at any time [1].
Construction activity is separately controlled, with precautions specified by regulation applying to construction works, transport of resulting debris or soil, and burning of fuel, and concerned authorities must ensure compliance before issuing permits [1].
Sanitary landfill requirements
Ministerial Decision 17/93 sets out landfill requirements with unusual specificity, and the level of detail is operationally useful because it removes interpretive latitude.
Two core prohibitions apply. Solid non-hazardous waste may only be disposed of in sanitary landfills licensed by the Ministry, and no solid non-hazardous waste may be mixed with any category of hazardous waste at any stage [2].
Licensing and design obligations require the concerned authority to obtain a Ministry licence for its sanitary landfill, designed and operated in accordance with the guidelines in appendix 4 to the Regulations, and to submit an environmental impact assessment to the Ministry [2].
Capacity planning parameters are stated in the Regulations themselves. Disposal area is divided into stages, with one stage operative at a time, and each stage designed to accommodate waste for a period of 3 to 4 years. For capacity estimation, compacted waste after a certain degree of stability may be assumed to occupy 1.2 m3 per tonne, while uncompacted waste occupies 2 m3 per tonne, and materials used for daily and final cover must be included in the estimate [2].
Acceptance restrictions are itemised [2]:
No waste other than solid non-hazardous waste.
Sludge from treated wastewater must be dried to at least 20 per cent dry solids, must not exceed 15 per cent of total volume of deposited solids, and requires Ministry approval before acceptance or disposal.
Carcasses and slaughterhouse waste require Ministry approval.
No liquid waste or hazardous waste, including hospital waste.
Operational requirements are equally specific [2]:
The site must be fenced with the entrance closed to prevent random dumping, wind dispersal and animal access, guarded during work hours and closed at the end of them.
All waste received must be monitored and recorded by type, quantity and source.
Site staff must be instructed on site management and the types of solid waste that may be received.
Large refuse heaps should be covered by nets or temporary fences to prevent dispersal.
Compacted waste layers must be covered by a layer of suitable filling material 0.25 metres thick.
Solid waste must not be left uncovered after the end of work hours.
The site must be kept clean and tidy, sweeping and scavenging are not allowed in order to avoid health hazards and interruption of operations, and waste incineration or setting fires at the site is prohibited.
Post-closure obligations require measures to maintain the site after final closure [2].
Ironware and old vehicles must be stored in a specific area for disposal in due time [2].
Sludge land application is separately controlled, requiring the soil to be tested by the owner for listed metals and pH before initial application, with sludge quality and reuse method meeting the standards in the relevant table or any further limits in the permit, and sludge with metal concentrations above the prescribed limits going to solid waste sanitary landfill or another approved site. These land application controls may sit in separate wastewater reuse regulations rather than the solid waste Regulations; verify the source instrument.
Hazardous waste regime
The Regulations for the Management of Hazardous Waste operate through a consignment note system combined with facility licensing at every stage of the chain.
The consignment note is the control instrument. Every hazardous waste generator must complete a Consignment Note for each category of hazardous waste before the waste leaves their land or premises [3]. A Consignment Note is defined as a document listing the category and quantity of hazardous waste in accordance with the relevant order issued by the Minister [3].
Labelling and packing must follow the Ministerial Decision issued in that respect [3].
Facility licensing applies across the chain [3]:
Storage facility, defined as a site licensed by the Ministry for reception and interim storage of hazardous waste. Owners must apply for a licence and operate only in accordance with its terms, which include a requirement that all hazardous waste received is accompanied by an appropriate Consignment Note, and may only release waste accompanied by a Consignment Note.
Pretreatment facility, defined as a site licensed for pretreatment, meaning any physical, chemical or biological treatment or process by which hazardous waste is rendered less noxious or innocuous. Owners must apply for a licence before starting activities and may not receive waste outside the licence conditions.
Hazardous waste landfill site, defined as a landfill licensed by the Ministry where hazardous waste may be disposed of. Owners must apply for a licence and may not receive waste unaccompanied by a Consignment Note.
Health approval is a precondition. Before the Ministry issues a licence under these Regulations, Ministry of Health approval must be obtained for all projects involving collection, transport, storage, pretreatment and disposal of hazardous waste [3].
A recycling exemption applies. Hazardous waste or any of its components may be recycled at the point of generation or elsewhere only within the conditions of the Regulations, and where recycling is limited to the point of generation the generator is not required to complete a Consignment Note [3].
Generator definition is broad, covering the owner or agent of any land or premises of any type where hazardous waste is generated, and any person or agent trading in hazardous materials having hazardous residues of any kind or from any source [3].
Marine and discharge provisions
Royal Decree 114/2001 addresses marine disposal and discharge alongside land-based waste.
Marine structures, aircraft and institutions undertaking works pertaining to exploration or exploitation of natural resources or any other works may not dump waste of any kind into the territorial waters or the exclusive economic zone [1].
Delivery of waste must take place at reception facilities or other places specified by the Ministry, after payment of the prescribed fees [1]. That mirrors the MARPOL port reception facility obligation and is the domestic mechanism giving it effect [8].
Dumping is defined to include deliberate disposal of waste or other matter [1].
Sewage water and other water pollutants may not be discharged into rainwater drainage networks; verify the source instrument, as this provision may sit in wastewater or water protection legislation rather than the solid waste Regulations.
Institutions engaged in exploitation of natural resources must set controls for optimum exploitation to conserve resources and protect them from pollution, and concessions for oil, gas or other natural resources must include such provisions [1].
be’ah operations and commercial terms
be’ah delivers national waste infrastructure and publishes operating terms and tariffs, which provides unusual transparency for planning purposes.
Manifest system. Waste generators must create a manifest through be’ah’s online system, providing generator details and waste information to identify the generator, enable tracking of waste streams and ensure safe handling and disposal [4]. The manifest number and details must be clearly visible on all packaging and containers by means of a label available after applying through the system, and the correct label must be clearly visible on packaged waste [4].
Each batch of waste requires one manifest [4].
Packaging. All hazardous waste must be packed in UN approved containers unless alternatives are approved by be’ah, and the generator is responsible for compliant packaging [4].
Weighing. The weight registered at be’ah’s facility is considered the final amount of waste for treatment, and the weight captured at the Industrial Waste Treatment Facility is always considered the final weight received [4].
Liability and chain of custody. Waste ownership and liability remain with the generator until received at the treatment facility and checked for conformance [4]. In case of rejection due to non-conformance the generator is responsible and must ensure the waste is returned to their facility [4].
Non-conformance consequences. Where non-conformances are observed or wrong information is given on the waste, packaging or labelling, the generator is notified and extra charges apply [4].
Transporter requirements. The hazardous waste transporter must be certified by the relevant authority and accepted by be’ah [4].
Duty of care. The generator must take all necessary measures not to subject any individual to risks associated with handling the waste [4].
Published tariffs, per tonne in Omani rials and excluding VAT [4]:
Inert landfill 7.
Single lined landfill 15.
Double lined landfill 21.
Solidification 72.
Incineration, physico-chemical treatment and others, 92 to 3,000.
Minimum fee for landfilling, solidification and special treatment equals the disposal fee for one tonne, and an administrative charge of OMR 50 per transaction applies for waste below one tonne going to treatment other than those categories [4]. Payment is due within 30 days of invoice or as per the agreed contract, and rates are subject to change with advance notification [4].
The tariff structure is analytically informative. The threefold difference between inert landfill at OMR 7 and double lined at OMR 21 prices containment directly, and the step to solidification at OMR 72 and incineration from OMR 92 prices treatment against disposal, which creates a measurable incentive for waste minimisation and for reclassification through pretreatment.
Comparison with UAE practice
For operators working across both jurisdictions, several structural differences matter.
Consignment note versus e-manifest. Oman’s system is a Ministerial consignment note with a be’ah online manifest layer [3][4], while Abu Dhabi uses the Bolisaty e-manifest and the UAE 2021 Implementing Regulation requires cross-emirate transport with GPS tracking [5].
Single national operator versus emirate-level structures. be’ah operates nationally, whereas UAE arrangements are emirate-specific, with the Environment Agency Abu Dhabi holding licensing and permitting since 29 May 2024 and Dubai Municipality’s Waste and Sewerage Agency regulating under Law No. 18 of 2024 [6].
Published versus varied tariffs. be’ah publishes a national tariff [4]; UAE gate fees are emirate-level, with Dubai at AED 550 per tonne for hazardous waste against AED 100 for general and organic and AED 2 for clean inert construction and demolition material [6].
Prescriptive landfill design in regulation. Oman’s appendix 4 to Ministerial Decision 17/93 specifies cover thickness, capacity assumptions and operating rules in the regulatory instrument itself [2], whereas UAE Federal Law No. 12 of 2018 Article 9 provides for landfill requirements through the Implementing Regulation [5].
Statutory radioactivity threshold. Oman defines radioactive waste at above 100 becquerels per gram in the primary law [1].
Practical compliance sequence
An operator establishing a waste-generating or waste-handling activity in Oman should work through a defined sequence.
Determine whether the activity constitutes a source or area of work requiring an environmental permit under Royal Decree 114/2001 Article 9 [1].
Establish whether the activity may constitute an avoidable or curable risk requiring a detailed environmental impact assessment before permit application [1].
Confirm the buffer or safe area requirement for the site [1].
Classify all waste streams, distinguishing solid non-hazardous, hazardous and radioactive against the 100 becquerel per gram threshold [1].
For hazardous streams, establish consignment note procedures and confirm that receiving facilities hold the relevant licence [3].
Confirm transporter certification and be’ah acceptance [4].
For any cross-border movement, apply the Basel Prior Informed Consent procedure alongside the domestic consignment note [7].
Register on the be’ah manifest system and establish labelling procedures [4].
Establish discharge and waste records for Environment Authority inspection [1].
For any landfill development, follow appendix 4 design guidelines and submit the environmental impact assessment [2].
Frequently asked questions
What permit is needed before starting operations? An environmental permit confirming environmental soundness, issued by the Environment Authority on application by the owner, before any source or area of work is established [1].
Can non-hazardous and hazardous waste be mixed? No. Solid non-hazardous waste may only go to licensed sanitary landfill and must not be mixed with any category of hazardous waste at any stage [2].
What is a Consignment Note? A document listing the category and quantity of hazardous waste, which the generator must complete for each category before the waste leaves their premises [3].
What does disposal cost? be’ah publishes rates per tonne excluding VAT: OMR 7 inert landfill, 15 single lined, 21 double lined, 72 solidification, and 92 to 3,000 for incineration and physico-chemical treatment [4].
Who is liable during transport? The generator. Ownership and liability remain with them until the waste is received at the treatment facility and checked for conformance [4].
References
Show all 8 sources
- Royal Decree No. 114/2001 issuing the Law on Conservation of the Environment and Prevention of Pollution, Sultanate of Oman. Accessed: 7 September 2026.
- Ministerial Decision No. 17/93, Regulations for the Management of Solid Non-Hazardous Waste, Sultanate of Oman, including appendix 4 sanitary landfill guidelines (verify against the official Oman legal gazette). Accessed: 7 September 2026.
- Ministerial Decision No. 18/93, Regulations for the Management of Hazardous Waste, Sultanate of Oman. Accessed: 7 September 2026.
- be’ah. Industrial Waste Terms and Conditions: manifest system, packaging, liability and disposal tariffs. Accessed: 7 September 2026.
- UAE Federal Law No. 12 of 2018 on Integrated Waste Management, Article 9, and Implementing Regulation 2021. Accessed: 7 September 2026.
- Business Dubai. Waste Management and Recycling Business in Dubai: permitting under Law No. 18 of 2024 and gate fees. August 2026. Accessed: 7 September 2026.
- Basel Convention Secretariat. Prior Informed Consent procedure for transboundary movement. Accessed: 7 September 2026.
- International Maritime Organization. MARPOL port reception facility obligations. Accessed: 7 September 2026.
Related articles
- UAE federal waste regulation
- Saudi Arabia
- Qatar
- Bahrain
- Kuwait
- Basel Convention
- Hazardous waste classification
- Sanitary landfill design
- Waste management in the Gulf context
About this article
Charmaine Frost is a landfill gas and waste-management specialist and a founding director of Qualifrost FZC LLC. Her experience was gained with major UK waste-management companies, covering landfill gas generation and collection systems, environmental monitoring and the practical risks of landfill operations. She holds the NEBOSH International General Certificate and has submitted her final NEBOSH Diploma assessment, with results expected in March–April 2027.
Reviewed by Adrian Frost, Director. Every article is checked against primary sources before publication: legal claims are verified against the instrument itself, and figures against the original dataset.
Published 25 August 2026 · Last reviewed 25 August 2026 · Next review August 2027, or sooner if the law changes.