Bahrain: The Supreme Council for Environment and Waste Regulation

Bahrain regulates environmental matters, including waste, through the Supreme Council for Environment under Law No. 7 of 2022 concerning the Environment, which replaced Decree-Law No. 21 of 1996. This guide covers the three compliance instruments the SCE operates, what an EIA must contain, the waste characterisation and manifesting requirement, and how enforcement works.

By Charmaine Frost, Director and Landfill Gas Specialist

Aerial view of an urban waste facility with city skyline

In short

The Supreme Council for Environment is Bahrain’s apex environmental regulator, administering Law No. 7 of 2022 concerning the Environment (which replaced Decree-Law No. 21 of 1996) and its implementing resolutions [1]. Its mandate covers air quality, marine and groundwater protection, hazardous and non-hazardous waste, biodiversity, environmental impact assessment and noise [1]. For industrial operators, compliance is operationalised through three instruments: EIAs for new or modified projects, environmental permits for ongoing operations, and periodic monitoring returns [1]. Solid and hazardous waste must be characterised, manifested and routed to SCE-approved disposal pathways [1]. The detailed obligations summarised in this guide draw on a secondary source and should be verified against Law No. 7 of 2022 and current SCE resolutions before reliance.


Key facts

  • The Supreme Council for Environment administers Law No. 7 of 2022 concerning the Environment (which replaced Decree-Law No. 21 of 1996) and its implementing resolutions [1].
  • SCE mandate covers air quality management, marine and groundwater protection, hazardous and non-hazardous waste, biodiversity and protected areas, environmental impact assessment and noise control [1].
  • Compliance operates through three instruments: EIAs for new or modified projects, environmental permits for ongoing operations, and periodic monitoring returns [1].
  • Solid and hazardous waste streams must be characterised, manifested and routed to SCE-approved disposal pathways [1].
  • EIA is required for industrial plants, oil and gas facilities, large construction, ports, power and desalination, and waste-management installations before licensing [1].
  • EIA submissions are expected to be quantitative, with air emission predictions modelled and benchmarked against Bahraini ambient and emission limits [1].
  • Environmental management plans must specify monitoring frequencies, reporting cycles and the responsible personnel for each commitment [1].
  • SCE inspectors conduct site visits and can suspend operations for serious or repeat exceedances [1].

Plain English — the essentials, in everyday language

Plain English

The regulator

The Supreme Council for Environment, the SCE, is Bahrain’s apex environmental regulator [1].

It administers Law No. 7 of 2022 concerning the Environment, which replaced Decree-Law No. 21 of 1996, and its implementing resolutions [1].

What it covers

The SCE mandate is broad [1]:

Air quality management.

Marine and groundwater protection.

Hazardous and non-hazardous waste.

Biodiversity and protected areas.

Environmental impact assessment.

Noise control.

Three instruments

For an industrial operator, SCE compliance comes down to three things [1]:

Environmental impact assessments for new or modified projects.

Environmental permits for ongoing operations.

Periodic monitoring returns.

Understanding those three is understanding Bahraini environmental compliance.

When an EIA is required

Projects with potential environmental impact must submit an EIA to the SCE before licensing [1].

That covers industrial plants, oil and gas facilities, large construction, ports, power and desalination, and waste-management installations [1].

A waste facility is squarely within scope.

What the EIA must contain

The SCE expects a defined set of content [1]:

Baseline environmental conditions.

Predicted impacts across air, water, soil, noise, marine and biodiversity.

Mitigation measures.

Residual impacts.

An environmental management plan with monitoring commitments.

Quantitative, not descriptive

This is the point that distinguishes Bahraini practice.

EIA submissions are expected to be quantitative [1].

Air emission predictions must be modelled and benchmarked against Bahraini ambient and emission limits [1].

A qualitative assessment saying impacts will be minor is not what the regulator is asking for.

Marine discharge

Marine and effluent discharges must respect SCE limits and protect the kingdom’s sensitive coastal ecosystems [1].

Bahrain is an archipelago. The marine environment is close to almost every industrial site, which raises the weight given to discharge assessment.

Waste requirements

Solid and hazardous waste streams must be characterised, manifested and routed to SCE-approved disposal pathways [1].

Three obligations in one sentence.

Characterised means you must know what the waste is, by analysis rather than assumption.

Manifested means each movement is documented.

SCE-approved pathways means you cannot choose your own disposal route.

Sensitive receptors

Where projects sit close to schools, hospitals or residential areas, the SCE expects mitigation [1].

Options named are stack heights, abatement, scheduling, or relocation of the activity itself [1].

That last one is worth noting. Relocation is on the regulator’s list.

The management plan

Environmental management plans must specify monitoring frequencies, reporting cycles, and the responsible personnel for each commitment [1].

Naming a responsible person for each commitment is a specific requirement, and it is what turns a plan into an accountable document.

Ongoing obligations

Operators must [1]:

Hold valid SCE environmental permits.

Conduct EIAs for new or modified projects.

Monitor air, water, marine and noise emissions to permitted limits.

Segregate and manage hazardous and municipal waste.

Submit periodic returns.

Enforcement

SCE inspectors conduct site visits and can suspend operations for serious or repeat exceedances [1].

Suspension is the operative sanction, and repeat exceedance is called out specifically.

Post-construction

The SCE may also require post-construction environmental audits and ongoing emissions, effluent and waste reporting [1].

So the EIA is not closed out at commissioning.

The wider HSE picture

Environmental compliance sits alongside occupational safety. Bahrain’s HSE regulatory stack is multi-agency, with the SCE regulating environmental compliance under Law No. 7 of 2022 and the Ministry of Labour and Social Development administering the Labour Law [1].

Ministerial Order 8/2013 covers occupational safety and health [1].


Professional layer — engineering, operations & compliance detail (click to expand)

Professional

Regulatory framework

Bahrain’s environmental regulation is administered by a single apex body operating under a primary law with downstream resolutions.

The Supreme Council for Environment is Bahrain’s apex environmental regulator, administering Law No. 7 of 2022 concerning the Environment (which replaced Decree-Law No. 21 of 1996) and its implementing resolutions [1].

Downstream resolutions cover air emissions, marine and groundwater protection, hazardous and municipal waste, EIA approvals, and environmental permits for industrial and infrastructure projects [1].

The SCE mandate covers air-quality management, marine and groundwater protection, hazardous and non-hazardous waste, biodiversity and protected areas, environmental impact assessment, and noise control [1].

The regulatory stack is multi-agency for HSE generally. The SCE regulates environmental compliance, EIA, air, water and waste under Law No. 7 of 2022, while the Ministry of Labour and Social Development administers the Bahrain Labour Law for the Private Sector, with occupational safety and health under Ministerial Order 8/2013 [1]. Civil Defence and the Labour Market Regulatory Authority hold further roles [1].

The three compliance instruments

For industrial operators, SCE compliance is operationalised through three instruments: environmental impact assessments for new or modified projects, environmental permits for ongoing operations, and periodic monitoring returns [1].

That structure maps onto a project lifecycle. EIA precedes licensing, the permit governs operation, and monitoring returns evidence continuing compliance.

The distinction between the EIA and the permit matters practically. The EIA establishes acceptability and generates commitments; the permit converts those commitments into enforceable conditions with limits.

Environmental impact assessment

EIA applicability is defined by project type and potential impact. Under Law No. 7 of 2022 and SCE implementing resolutions, projects with potential environmental impact must submit an EIA to the SCE before licensing, including industrial plants, oil and gas facilities, large construction, ports, power and desalination, and waste-management installations [1].

Required content is specified. The EIA must cover baseline environmental conditions, predicted impacts across air, water, soil, noise, marine and biodiversity, mitigation measures, residual impacts, and an environmental management plan with monitoring commitments [1].

The quantitative expectation is the defining characteristic of Bahraini EIA practice. Submissions are expected to be quantitative, with air emission predictions modelled and benchmarked against Bahraini ambient and emission limits [1].

That has direct consequences for assessment scope and cost. Dispersion modelling against national limits is required rather than optional, and the baseline data supporting that modelling must be adequate for the purpose.

Marine and effluent discharges must respect SCE limits and protect the kingdom’s sensitive coastal ecosystems [1]. Given Bahrain’s archipelagic geography, marine receptors are proximate to most industrial development, and the Gulf’s shallow, semi-enclosed character with restricted exchange compounds the sensitivity [2].

Waste stream treatment within the EIA requires that solid and hazardous waste streams be characterised, manifested and routed to SCE-approved disposal pathways [1]. The assessment therefore needs a defined disposal route for each stream, not a general statement that waste will be managed appropriately.

Sensitive receptor mitigation is expected where projects sit close to schools, hospitals or residential areas, with the SCE expecting mitigation through stack heights, abatement, scheduling, or relocation of activity [1]. The inclusion of relocation indicates that siting remains open at assessment stage rather than being treated as fixed.

Post-construction audit may be required, alongside ongoing emissions, effluent and waste reporting [1], which means EIA commitments persist into operation rather than being discharged at commissioning.

Environmental management plans

Environmental management plans must specify monitoring frequencies, reporting cycles, and the responsible personnel for each commitment [1].

The requirement to name responsible personnel for each commitment is a specific accountability mechanism, and it converts the plan from a statement of intent into an auditable allocation of duty.

The practical implication for the operator is that the EMP becomes a live compliance document rather than an appendix. Each commitment needs an owner, a frequency and a reporting route, and those need to survive personnel changes.

Operating obligations

The continuing compliance baseline requires operators to hold valid SCE environmental permits, conduct EIAs for new or modified projects, monitor air, water, marine and noise emissions to permitted limits, segregate and manage hazardous and municipal waste, and submit periodic returns [1].

Two points warrant emphasis.

Modification triggers EIA. New or modified projects require assessment [1], so a material change to an existing operation is not covered by the original approval.

Segregation is a stated obligation. Hazardous and municipal waste must be segregated and managed [1], which makes commingling a compliance failure rather than merely inefficient practice.

Waste-specific requirements

The waste obligations are stated compactly and carry three distinct duties.

Characterisation requires knowing the composition and hazardous properties of each stream by analysis, which parallels the characterisation requirements applied under the Basel framework for transboundary movement [3] and under EU waste acceptance criteria [4].

Manifesting requires documented movement, providing the chain of custody record from generator to approved facility.

SCE-approved disposal pathways constrain routing. The operator cannot select a disposal route independently; the route must be approved.

Together those three convert waste management from an operational matter into a permitted and evidenced activity.

Monitoring and returns

Periodic monitoring returns are the third compliance instrument [1].

Monitoring must cover air, water, marine and noise emissions against permitted limits [1], with frequencies, reporting cycles and responsible personnel specified in the environmental management plan [1].

For a waste facility, the monitoring suite would typically extend to landfill gas and leachate where applicable, groundwater where a containment risk exists, and stack emissions where thermal treatment is undertaken, following the general principles applied to those technologies [5].

Evidence retention matters as much as measurement. A facility achieving compliant performance without documentation has not demonstrated compliance, which is a general principle across permitting regimes and applies here through the monitoring return mechanism.

Enforcement

SCE inspectors conduct site visits and can suspend operations for serious or repeat exceedances [1].

Two features of that formulation are operationally significant.

Suspension is the named sanction, which is an operational rather than purely financial consequence and therefore carries direct revenue impact.

Repeat exceedance is treated alongside serious exceedance, so a pattern of minor breaches carries enforcement risk equivalent to a single significant one. That places weight on trend management rather than on avoiding individual excursions.

Compliance baseline

A working compliance baseline for a Bahraini industrial or waste operator comprises [1]:

A current SCE environmental permit with monitoring obligations tracked to schedule.

EIA approval where applicable, with the environmental management plan implemented and audited annually.

Monitoring across air, water, marine and noise to permitted limits.

Waste characterisation, manifesting and routing to approved pathways.

Periodic returns submitted on cycle.

Occupational safety compliance under Ministerial Order 8/2013 alongside environmental compliance [1].

Obligation tracking is the practical mechanism. Capturing EIA commitments and SCE permit conditions as auditable obligations, with scheduled monitoring for air, water, noise and waste returns, evidence attached and upcoming deadlines visible, is the operating model that satisfies the regime [1].

Comparison with neighbouring frameworks

For operators working across the GCC, several structural differences are worth noting.

Single apex regulator. Bahrain concentrates environmental regulation in the SCE [1], whereas the UAE operates a federal framework with emirate-level implementation, the Environment Agency Abu Dhabi holding licensing and permitting since 29 May 2024 and Dubai Municipality’s Waste and Sewerage Agency regulating under Law No. 18 of 2024 [6].

Quantitative EIA expectation. Bahrain’s explicit requirement for modelled and benchmarked air emission predictions [1] sets a defined technical standard for assessment.

Approved disposal pathways. The requirement to route waste to SCE-approved pathways [1] parallels the licensed facility requirement in Oman, where storage, pretreatment and hazardous landfill facilities each require Ministry licences [7].

Suspension powers. The stated ability to suspend operations for serious or repeat exceedances [1] is a direct operational sanction, comparable in effect to the substantial financial penalties available under UAE Federal Law No. 12 of 2018 Article 28, which provides for fines up to AED 1,000,000 [8].

Practical compliance sequence

For a new or modified waste-related project in Bahrain:

Establish whether the project falls within EIA scope, which waste-management installations do [1].

Scope the EIA against the required content: baseline, predicted impacts across all media, mitigation, residual impacts and environmental management plan [1].

Plan for quantitative assessment, including air dispersion modelling benchmarked against Bahraini ambient and emission limits [1].

Assess marine and effluent discharge against SCE limits with attention to coastal sensitivity [1].

Characterise every waste stream and identify an SCE-approved disposal pathway for each [1].

Assess proximity to sensitive receptors and identify mitigation, recognising that relocation is within the regulator’s expected option set [1].

Prepare the environmental management plan with monitoring frequencies, reporting cycles and named responsible personnel for each commitment [1].

Obtain the environmental permit and establish the monitoring and returns schedule.

Plan for post-construction audit and continuing reporting [1].



Frequently asked questions

Who regulates waste in Bahrain? The Supreme Council for Environment, administering Law No. 7 of 2022 concerning the Environment (which replaced Decree-Law No. 21 of 1996) and its implementing resolutions [1].

When is an EIA required? Before licensing, for projects with potential environmental impact including industrial plants, oil and gas, large construction, ports, power and desalination, and waste-management installations [1].

What standard of EIA does the SCE expect? Quantitative. Air emission predictions must be modelled and benchmarked against Bahraini ambient and emission limits [1].

What are the waste obligations? Solid and hazardous waste must be characterised, manifested and routed to SCE-approved disposal pathways [1].

What can the regulator do on breach? SCE inspectors conduct site visits and can suspend operations for serious or repeat exceedances [1].


References

Show all 8 sources
  1. SmartQHSE. Bahrain HSE Compliance 2026: Supreme Council for Environment, Decree-Law 21/1996, EIA requirements and enforcement. April 2026. Accessed: 7 September 2026. (Secondary commercial summary. The primary instrument is Law No. 7 of 2022 concerning the Environment, Kingdom of Bahrain (legalaffairs.gov.bh), read with current Supreme Council for Environment resolutions (SCE website). Verify specific obligations against these primary sources.)
  2. International Maritime Organization. MARPOL Special Areas: Gulf designation and receiving environment characteristics. Accessed: 7 September 2026.
  3. Basel Convention Secretariat. Prior Informed Consent procedure and waste characterisation. Accessed: 7 September 2026.
  4. Council Decision 2003/33/EC establishing criteria and procedures for the acceptance of waste at landfills. Accessed: 7 September 2026.
  5. Dubai Waste. Dubai Waste-to-Energy 2026: continuous emissions monitoring practice. 28 February 2026. Accessed: 7 September 2026.
  6. Business Dubai. Waste Management and Recycling Business in Dubai: permitting under Law No. 18 of 2024. August 2026. Accessed: 7 September 2026.
  7. Regulations for the Management of Hazardous Waste, Sultanate of Oman: facility licensing. Accessed: 7 September 2026.
  8. UAE Federal Law No. 12 of 2018 on Integrated Waste Management, Article 28. Accessed: 7 September 2026.

About this article

Charmaine Frost is a landfill gas and waste-management specialist and a founding director of Qualifrost FZC LLC. Her experience was gained with major UK waste-management companies, covering landfill gas generation and collection systems, environmental monitoring and the practical risks of landfill operations. She holds the NEBOSH International General Certificate and has submitted her final NEBOSH Diploma assessment, with results expected in March–April 2027.

Reviewed by Adrian Frost, Director. Every article is checked against primary sources before publication: legal claims are verified against the instrument itself, and figures against the original dataset.

Published 25 August 2026 · Last reviewed 25 August 2026 · Next review August 2027, or sooner if the law changes.