Procurement and Contracting Models: DB, DBO, BOT, BOOT, PPP and Concessions

Explains how DB, DBO, BOT, BOOT, PPP and concession models allocate risk in waste infrastructure, why availability versus volume-based payment matters most, and which structures Dubai and Abu Dhabi chose.

Knowledge Hub → Facility Design & Planning → Procurement and Contracting Models: DB, DBO, BOT, BOOT, PPP and Concessions

Procurement and Contracting Models: DB, DBO, BOT, BOOT, PPP and Concessions

The contracting model decides who carries which risk for the next thirty years, and that allocation matters more than the acronym. This guide covers the delivery models, the two payment mechanisms that actually differentiate them, how waste-specific risks are allocated, and what the Gulf projects chose.

By Charmaine Frost, Director and Landfill Gas Specialist

Contract negotiation meeting in a conference room

In short

Procurement models for waste infrastructure differ principally in who designs, who finances, who operates and who bears demand risk. Ownership acronyms such as BOT, BOOT, BOO, DBO and DBFO describe the structure; the payment mechanism, whether availability-based or volume-based, determines the risk allocation that matters [1]. Under availability payment, revenues come from the contracting authority for making the facility available, with deductions where availability and performance criteria are not met, and the private partner does not take demand risk [1][2]. Warsan operates under a 35-year public-private partnership; Abu Dhabi’s plant under a 30-year concession [3][4].


Key facts

  • Ownership structure and payment mechanism are independent: PPPs can use user charges, availability payments or offtake contracts regardless of the ownership acronym applied [2].
  • Under availability-based contracts the private party does not take demand risk, and payment depends on whether the facility meets performance standards rather than on how much it is used [2].
  • Where the contracting authority takes the entire waste capacity, revenues may be structured on an availability basis with deductions applied where availability and performance criteria are not met [1].
  • The contracting authority typically bears waste supply risk, either through availability payment or by guaranteeing minimum quantity with liability to compensate for lost gate fee and lost power generation [1].
  • Transferring demand risk is only practicable where the private partner can fill spare capacity with waste it sources itself; where government controls most waste, volume risk transfer may be unrealistic [1].
  • It is common in some markets for the contracting authority to retain most demand and revenue risk, with projects purporting to transfer demand risk typically involving government support such as a minimum volume guarantee [1].
  • Dubai’s Warsan facility operates under a 35-year public-private partnership contracted at 5,500 tonnes per day, around 45 per cent of Dubai’s waste [3].
  • Abu Dhabi’s waste-to-energy plant is owned and operated for 30 years under a concession with EWEC procuring the electricity [4].

Plain English — the essentials, in everyday language

Plain English

What the models actually differ on

The acronyms describe who does what across four functions: design, build, finance, operate. Plus who owns the asset and when it transfers.

Design-Build means one contractor designs and constructs. The client finances it and operates it afterwards.

Design-Build-Operate adds a long operating period to the same contract.

Build-Operate-Transfer adds private finance. The private party builds, operates for a concession period, then transfers the asset to the public sector.

Build-Own-Operate-Transfer is the same with ownership during the term. Build-Own-Operate has no transfer at all.

Design-Build-Finance-Operate is the same family described by function rather than ownership.

The distinction that matters more

Here is the point that gets lost in the acronyms.

Ownership structure and payment mechanism are independent [2]. You can have a BOT paid by user charges, or a BOT paid an availability fee.

PPP is the broad term for any long-term public-private infrastructure contract. BOT is one ownership structure within it, and PPPs can use user charges, availability payments or offtake contracts regardless of which acronym is used [2].

So asking “is it a BOT?” tells you less than asking “who gets paid what, when, and for what?”

Availability payment

Under an availability-based contract, the authority pays a service fee for making the facility available, regardless of how much it is used [2].

Payment depends on whether the facility meets performance standards, not on throughput [2].

The private party does not take demand risk [2]. If the waste does not arrive, the payment continues, subject to the facility being available.

This structure came from the UK Private Finance Initiative in the 1990s [2].

Volume-based payment

The alternative pays per tonne received. Revenue rises and falls with throughput.

That transfers demand risk to the private party, which only works if they can genuinely manage it.

Why waste favours availability payment

Waste has a specific characteristic that pushes toward availability payment.

If the government controls collection and disposal of all or most waste, and there is no significant private commercial market, the private partner cannot fill spare capacity from other sources [1].

That means they cannot mitigate volume risk. Accepting it would be accepting a risk they have no tools to manage, which they will price accordingly or refuse.

So it is common in some markets for the contracting authority to retain most demand and revenue risk and pay an availability-based payment [1].

The minimum volume guarantee

Where a project does transfer demand risk, it usually comes with support.

Projects purporting to transfer demand risk typically involve some level of government support underpinning the transfer, such as a minimum volume guarantee, particularly in developing markets [1].

The authority guarantees a minimum tonnage and compensates for the shortfall, including lost gate fee and associated lost power generation [1].

Continuity of service

A waste-specific question that contracts must resolve explicitly.

If the plant cannot process waste, who finds an alternative outlet?

If the private partner is responsible, they continue to receive the availability payment or gate fee for waste received, and must bear the increased costs of transport to and disposal at alternative facilities [1].

If the authority is responsible, there should be an abatement in payment under an availability structure, or a reduction by reference to lower volume processed under a tonnage structure [1].

Leaving this unaddressed produces a dispute at the first outage.

Performance and deductions

Availability payments come with a deduction regime.

Deductions or penalties are typically applied where the private partner has not met contractual availability and performance standard criteria [1].

That is what makes availability payment more than a guaranteed income. The facility has to work.

Inflation

Long contracts need indexation, and the mechanism differs by payment type.

On per-tonne gate fee projects, an escalation factor applies to the gate fee, which may be linked to the proportion referable to fixed and variable operation and maintenance costs [1].

On availability-based projects, the payment typically includes a fixed component where debt has been hedged, plus a variable component with an escalation factor accounting for cost rises [1].

Choosing a structure

Several factors decide [2]:

Project type, since process plants suit offtake contracts while public infrastructure suits concessions or availability models.

Political acceptability, since user charges may face opposition.

Demand certainty, since uncertain usage favours availability-based and predictable demand suits concessions.

Government capacity, since availability contracts require ongoing budget commitment.

Legal framework, since some jurisdictions have PPP legislation and others do not.

Risk appetite, since availability contracts transfer less risk but may cost more long term.

One warning

Structures are not interchangeable. You cannot convert a concession to an availability-based contract mid-project without fundamental renegotiation [2].

The decision is made once, at procurement, and it governs for decades.

What the Gulf chose

Dubai’s Warsan operates under a 35-year public-private partnership with Dubai Municipality, contracted at 5,500 tonnes per day, about 45 per cent of Dubai’s waste, in a one-to-one relationship [3].

Abu Dhabi’s waste-to-energy plant is delivered under a concession between EWEC and Tadweer with a Marubeni, Hitachi Zosen Inova and JOIN consortium, owned and operated for 30 years with EWEC procuring the electricity [4].

Abu Dhabi’s material recovery facility is a joint venture, Urbaser 60 per cent and Tadweer 40 per cent, with a five-year operating term [5].


Professional layer — engineering, operations & compliance detail (click to expand)

Professional

Model taxonomy

Delivery models are conventionally distinguished by which of design, build, finance and operate sit with the private party, and by ownership during and after the term.

Design-Build transfers design and construction to a single contractor under one contract, delivering interface integration and a single point of responsibility for defects. The client finances, owns and operates.

Design-Build-Operate extends the same contract into a long operating period, typically 10 to 20 years, aligning design decisions with lifecycle operating cost because the designer bears the consequences of their own decisions. Finance remains public.

Build-Operate-Transfer introduces private finance. The private party finances, constructs and operates for a concession period, recovering investment through the payment mechanism, then transfers the asset to the public sector.

Build-Own-Operate-Transfer is materially similar with ownership vesting in the private party during the term.

Build-Own-Operate has no transfer, with the asset remaining private indefinitely.

Design-Build-Finance-Operate describes the same allocation by function rather than by ownership.

Concession describes an arrangement in which the private party is responsible for determining demand for the service and the size of the facility, with facilities reverting to the public entity at term end, and payment by fixed monthly fee, variable fee or a mix [6].

Payment schemes vary from project to project: in some agreements the operator receives a fee for construction plus a fee for operation, both paid across the contract life; in others a retainer fee linked to facility availability plus a performance fee linked to production or use [6]. Financing may be private or mixed, with some public financing also taking place [6].

Payment mechanism as the real differentiator

The analytically important distinction is not ownership but payment mechanism, and conflating the two produces poor procurement decisions.

PPP is a broad term for any long-term contract between public and private sectors for infrastructure delivery, BOT is one ownership structure within it, and PPPs can have different payment mechanisms including user charges, availability payments and offtake contracts regardless of the ownership acronym used [2].

Three mechanisms exist.

Concession with user charges has the project company collecting charges directly from users, placing demand risk with the private party.

Availability-based payment has the contracting authority paying a service fee for making the facility available regardless of use, with payment depending on whether the facility meets performance standards rather than on usage, and the project company not taking demand risk [2]. This structure originated in the UK Private Finance Initiative in the 1990s [2].

Offtake contract has a defined offtaker purchasing the project’s output under a long-term agreement, which is the natural structure for process plants [2].

Waste projects frequently combine mechanisms, with a gate fee from the authority for waste received and a power purchase agreement for electricity output.

Demand and volume risk in waste

Waste projects present a demand risk profile that differs from most infrastructure, and the allocation follows from it.

Where the contracting authority takes the entire waste capacity of the plant, project revenues are generated through payments by the contracting authority which may be structured on an availability basis, with deductions or penalties typically applied where the private partner has not met contractual availability and performance standard criteria [1].

The contracting authority typically bears the risk of supplying waste, either by virtue of an availability-based payment structure or by agreeing to provide a guaranteed minimum quantity with liability to compensate the private partner for lost gate fee and associated lost power generation for the quantity not supplied [1].

Transfer of volume risk to the private party is conditional. It is only practicable where the private partner has a high degree of confidence in volumes available to the contracting authority, through market studies or historical data, and more importantly is able to mitigate its risk by filling spare capacity with other waste it can source itself, and by the gate fee it can charge for that waste [1].

Where the private partner does not have access to other waste sources, such as where government controls collection and disposal of all or most waste and there is no significant private sector market for industrial and commercial waste, it may be unrealistic for the private partner to accept waste volume risk, and in that case the payment mechanism may be structured on an availability basis [1].

Market practice reflects this. It is common for waste-to-energy projects in some markets to provide for the contracting authority to retain most of the demand and revenue risk and to pay an availability-based payment, and projects which purport to transfer demand risk typically involve some level of government support underpinning the risk transfer, such as a minimum volume guarantee, particularly in developing markets [1].

The practical test at procurement design is whether a private commercial and industrial waste market exists at sufficient scale for the private partner to fill spare capacity. Where it does not, volume risk transfer will be priced heavily or declined.

Continuity of service

Continuity of service is a waste-specific allocation question that generic PPP templates do not resolve.

The contracting authority needs to determine whether the performance regime should require the private partner to provide continuity of service by finding alternative disposal outlets for waste that cannot be processed at its own facility [1].

If the private partner is responsible for continuity of service, it should continue to receive the availability payment or gate fee for waste received and will be required to bear any increased costs of transportation to and disposal at alternative facilities [1].

If the contracting authority is responsible for finding alternative disposal, then in an availability-based payment structure there should be an abatement in the payment to the private partner, and in a tonnage-based payment structure a reduction by reference to the lower volume processed at the plant [1].

The allocation should be explicit, because planned and unplanned outages are certain over a 25 to 35 year term, and the cost of alternative disposal at prevailing hazardous or general gate fees can be substantial.

Operating and maintenance risk

Operating risk allocation follows the payment mechanism.

The private partner bears the risk of meeting the performance specification, ensuring works and operational performance are of the necessary quality and that the facility is ready to perform when required, with payment subject to abatement in an availability-based structure if availability criteria and performance-based standards are not met [7].

Availability criteria are typically linked to defined output capability measured against pre-determined schedules or standards, and performance monitoring enables the contracting authority to monitor service levels and receive early warning of matters requiring remediation [7].

The private partner bears the principal risk of meeting maintenance standards set out in the contractual performance specification, so that the asset remains available and robust and is handed back in the expected condition on expiry or early termination, including day-to-day routine maintenance, lifecycle maintenance and replacement of particular assets [7].

Handback condition is frequently underspecified and becomes contentious in the final years, when the private partner’s incentive to invest declines. Handback standards, survey mechanisms and retention arrangements should be defined at contract award.

Financial provisions

Long-term contracts require indexation and refinancing provisions.

On projects with a per-tonne gate fee, inflation protection is achieved through an escalation factor on the gate fee payable by the contracting authority and third-party users, which may be linked to the proportion of the gate fee referable to fixed and variable operation and maintenance costs [1].

On availability-based projects, the availability payment typically includes both a fixed component where debt has been hedged and a variable component including an escalation factor accounting for cost rises [1].

Indexation choice matters in less mature markets, where a general consumer price index may not mirror project cost drivers. The selected indexation method needs to reflect variable financing costs and variable inputs such as staff and materials, and it is more crucial in less mature markets to find appropriate indicators mirroring project needs rather than a general consumer price index [7].

Refinancing gain sharing options include a lump sum on refinancing to the extent the private partner receives such amounts at that time; a lump sum or periodic sums at the time of receipt or of the projected benefit in a payment-per-tonne model; a reduced availability payment in an availability-based model; a reduced per-tonne gate fee; or a combination [1][7].

Force majeure and termination

Force majeure relief provisions differ by payment mechanism.

In addition to relief from breach of affected obligations, the private partner may be granted cost relief; in an availability payment model it may also be granted payment deduction relief or relaxed performance standards, and in a demand-based model an increase in tariffs [1].

Options include compensation payment at the time, extensions of time or an extended operating period so the private partner can recoup lost revenue and costs, or increased availability payments [7].

On contracting authority default termination, in an availability model the private partner would typically receive amounts in respect of senior debt including hedge break costs where applicable, junior debt, equity investment and a level of equity return which should where possible reflect actual performance, together with redundancy and sub-contractor break costs, with a concession model following similar principles [7].

Lender requirements

Lender requirements shape structure independently of the authority’s preference.

The core concern is a predictable revenue stream sufficient to service debt. It is not always acceptable to lenders to have no element of fees that are fixed, as there is then no guaranteed payment stream for servicing loans where there is only a variable charge [8].

That constraint pushes structures toward at least a fixed component, whether an availability payment or a fixed element within a per-tonne fee, and it is a frequent reason that a purely volume-based structure proves unfinanceable at the intended gearing.

Worked contract examples illustrate the composition. A wastewater treatment and sludge disposal BOT paid a wastewater treatment contract payment as a variable charge based on volume treated, together with a sludge treatment contract payment as a variable charge based on volume plus suspended solids concentration plus mass of imported sludge [8].

Structure selection

Selection depends on several factors, and the choice is effectively irreversible [2]:

Project type, since process plants naturally suit offtake contracts while public infrastructure suits concessions or availability-based models.

Political acceptability, since user charges may face public opposition, favouring availability- based payment.

Demand certainty, since uncertain usage favours availability-based while predictable demand suits concessions.

Government capacity, since availability-based contracts require ongoing budget commitment while concessions require demand forecasting capability.

Legal framework, since some jurisdictions have established PPP or PFI frameworks and others favour traditional concession models.

Risk appetite, since availability-based contracts transfer less risk to the private sector but may cost more in the long run.

Two limitations apply. Structures are not interchangeable, and a concession cannot simply be converted to an availability-based contract mid-project without fundamental renegotiation [2]. And local legal frameworks constrain options, since some jurisdictions lack PPP legislation and others prohibit certain payment mechanisms [2].

Political risk over a multi-decade contract is material, as governments may change policy on user charges or availability payments [2].

Application in the UAE and GCC

Regional practice shows consistent use of long-term structures with public-sector demand risk retention.

Dubai’s Warsan Waste Management Centre operates under a 35-year public-private partnership with Dubai Municipality, contracted at 5,500 tonnes per day representing around 45 per cent of Dubai’s waste, in a one-to-one relationship in which the municipality supplies the waste and receives the electricity and ash [3]. EPC was led by Hitachi Zosen Inova for technology and combustion systems with BESIX for civil works, at approximately USD 1 billion, developed over eight to ten years and constructed July 2020 to July 2024 [3].

Abu Dhabi’s waste-to-energy project is delivered under a concession agreement between EWEC and Tadweer Group with a consortium of Marubeni, Hitachi Zosen Inova and JOIN, through a special purpose company jointly owned with Tadweer Group, constructing, operating, maintaining and owning the plant at 900,000 tonnes per year and 80 MW, owned and operated for 30 years with EWEC procuring the electricity, and commercial operations scheduled for 2027 [4].

Abu Dhabi’s greenfield material recovery facility uses a joint venture structure with Urbaser holding 60 per cent and Tadweer 40 per cent, with a five-year operating term at 400,000 tonnes per year [5].

Three observations follow for regional procurement.

Demand risk sits with the public sector in the major projects, consistent with the analysis that volume risk transfer is unrealistic where government controls most waste and no substantial private commercial market exists to absorb spare capacity [1].

Term lengths of 30 to 35 years reflect the capital intensity and the need to amortise over a long horizon, which places a corresponding requirement on the authority’s contract management capacity and on handback provisions.

Institutional attribution requires care because responsibilities have moved. In Abu Dhabi, waste licensing, permitting, vehicle tracking, tariff, sector regulation and inspection transferred from Tadweer to the Environment Agency Abu Dhabi on 29 May 2024, with operational landfill access remaining with Tadweer, while EWEC procures power. In Dubai, the Waste and Sewerage Agency of Dubai Municipality regulates under Law No. 18 of 2024 and its 2026 bylaw, with zone-based collection awarded on multi-year contracts [9].

Under UAE Federal Law No. 12 of 2018, Article 4 requires competent authorities to prepare waste management plans and Article 19 provides for inter-emirate joint facilities [10], the latter providing a legal basis for multi-emirate catchment procurement.



Frequently asked questions

Is BOT the same as PPP? No. PPP is the broad term for any long-term public-private infrastructure contract; BOT is one ownership structure within it, and payment mechanisms vary independently of the acronym [2].

What is an availability payment? A service fee paid for making the facility available regardless of use, with payment depending on meeting performance standards rather than throughput, so the private party does not take demand risk [2].

Why do waste projects favour availability payment? Because where government controls most waste and no substantial private commercial market exists, the private partner cannot fill spare capacity and therefore cannot manage volume risk [1].

Who finds alternative disposal during an outage? It must be allocated explicitly. If the private partner is responsible it retains payment but bears alternative disposal cost; if the authority is responsible, payment is abated [1].

What did the Gulf projects choose? Warsan is a 35-year PPP at 5,500 tonnes per day; Abu Dhabi’s plant is a 30-year concession with EWEC procuring electricity [3][4].


References

Show all 10 sources
  1. Global Infrastructure Hub. PPP Risk Allocation Tool: Waste to Energy Plant, revenue, demand, operating, inflation and force majeure risk. Accessed: 7 September 2026.
  2. Ryan O’Connell Finance. BOT, BTO, Concession, and PFI Project Finance Structures. June 2026. Accessed: 7 September 2026.
  3. Circular Business Review. Dubai’s Waste-to-Energy Plant to Cut 65 Million Tonnes of CO2 by 2030: contract structure and delivery. Accessed: 7 September 2026.
  4. Marubeni Corporation. Conclusion of a Concession Agreement for Abu Dhabi Waste-to-Energy Project in the United Arab Emirates. Accessed: 7 September 2026.
  5. Utilities Middle East. Tadweer awards Abu Dhabi waste recovery facility contract to Urbaser: joint venture structure and operating term. July 2026. Accessed: 7 September 2026.
  6. UNECE. PPP model comparison: BOT, BOOT, DBO, BOO and DBFO payment schemes. Accessed: 7 September 2026.
  7. Global Infrastructure Hub. PPP Risk Allocation Tool: operating risk, maintenance standards, indexation and termination provisions. Accessed: 7 September 2026.
  8. World Bank PPP Legal Resource Center. Wastewater Treatment and Sludge Disposal BOT: payment provisions and lender requirements. Accessed: 7 September 2026.
  9. Business Dubai. Waste Management and Recycling Business in Dubai: zone-based collection contracting and regulation. August 2026. Accessed: 7 September 2026.
  10. UAE Federal Law No. 12 of 2018 on Integrated Waste Management, Articles 4 and 19. Accessed: 7 September 2026.

About this article

Charmaine Frost is a landfill gas and waste-management specialist and a founding director of Qualifrost FZC LLC. Her experience was gained with major UK waste-management companies, covering landfill gas generation and collection systems, environmental monitoring and the practical risks of landfill operations. She holds the NEBOSH International General Certificate and has submitted her final NEBOSH Diploma assessment, with results expected in March–April 2027.

Reviewed by Adrian Frost, Director. Every article is checked against primary sources before publication: legal claims are verified against the instrument itself, and figures against the original dataset.

Published 25 August 2026 · Last reviewed 7 September 2026 · Next review August 2027, or sooner if the law changes.